Orange County NC Website
DocuSign Envelope ID:37AF196F-70A9-40BD-BDE0-4E0A39EC4A40 <br /> 2.2.7 Equipment Repair & Replacement —Time and Material <br /> Repair&Replacement Services. To reduce the effects of unbudgeted repairs, <br /> Siemens can provide labor and materials to repair or replace failed or worn <br /> components to maintain your equipment in peak operating condition. Components <br /> that are suspected of being faulty should be repaired or replaced in advance to <br /> minimize the occurrence of system interruptions. Equipment requiring attention will <br /> be brought to the owner's attention. Approved repairs can be performed on a time <br /> and material basis or through a formal proposal. <br /> Under this agreement we will provide repair&replacement services per our <br /> current time and material policy(see Appendix A). <br /> 2.2.8 Preventative Maintenance of Airborne Infectious Isolation <br /> (All) Room Mechanical Systems <br /> General Notes: This service agreement consists of the following <br /> mechanical preventative maintenance program. Below is the schedule for <br /> a quarterly program followed by the preventative maintenance tasks per <br /> equipment at the Orange County Isolation Rooms on the next page. <br /> Repair and replacement coverage is not included for the equipment and <br /> will be billed based on Siemens most current time and material pricing. <br /> Exhaust Fans—Two (2), Model: CWB-101 HP-4-X <br /> *ANNUAL MAINTENANCE—1 /Year <br /> 1. Change drive belt. <br /> 2. Check tightness of set screws on motor and fan sheaves and fan wheel <br /> 3. Check all bearing mountings for tightness <br /> 4. Clean fans,shafts and drives of excessive grease and dirt <br /> 5. Oil and grease all motor and fan bearings. <br /> *OPERATING INSPECTION—3/Year <br /> 1. Check drive belt for adjustment,tension and wear <br /> 2. Check tightness of set screws on motor and fan sheaves and fan wheel <br /> 3. Check all bearing mountings for tightness <br /> 4. Clean fans,shafts and drives of excessive grease and dirt <br /> *The FY 2017-2018 contract will cover a total of four inspections, one annual <br /> maintenance and three operating inspections. <br /> Siemens Industry, Inc. June 5, 2017 Page 12 <br />