Browse
Search
2017-352-E AMS - Statler Gilfillen Architect - Amendment to Contract - upgrade restrooms at OC facilities
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-352-E AMS - Statler Gilfillen Architect - Amendment to Contract - upgrade restrooms at OC facilities
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2018 9:51:24 AM
Creation date
8/2/2017 8:45:28 AM
Metadata
Fields
Template:
Contract
Date
7/7/2017
Contract Starting Date
9/16/2016
Contract Document Type
Contract Amendment
Amount
$225.00
Document Relationships
2016-526-E AMS - Statler Gilfillen Architect for AE/CA services for upgrades to single ocupancy restrooms
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2016
R 2017-352-E AMS - Statler Gilfillen Architect - Amendment to Contract - upgrade restrooms at OC facilities
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:4B735B44-FDA3-43D4-9F8F-3EDC4F31661B <br /> " II 4111114 Y <br /> Asset Management Services <br /> Date: July 7, 2017 <br /> Project: Single Occupancy Restroom at Rogers Road Community Center <br /> This contract amendment is to increase the contract amount by $225.00 <br /> Background: <br /> In September, 2016 Statler Gilfillen Architect was awarded a Design Services Contract for the Single <br /> Occupancy Restrooms for Rogers Road Community, Animal Services and Solid Waste Administrative <br /> Building. This contract also included Construction Administrative Services. During the construction of <br /> the restroom at the Rogers Road Community Center it was found that a support header was needed for <br /> the new door to be installed as the wall to be opened is a load bearing wall. This design required a <br /> Structural Engineer to design and provide stamped drawings. <br /> This contract amendment is to add an additional $225.00 to Statler Gilfillen Architect's contract to cover <br /> the cost for the additional structural engineer services required. <br /> P.O. Box 8181 * 131 West Margaret Lane,3rd Floor* Hillsborough, North Carolina 27278 <br /> Telephone:919 245-2625 <br /> Fax:919-644-3001 <br /> E-mail:AMService @orangecountync.gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.