Browse
Search
Agenda - 10-09-2002 - D.1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 10-09-2002
>
Agenda - 10-09-2002 - D.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2017 3:42:25 PM
Creation date
7/26/2017 12:07:29 PM
Metadata
Fields
Template:
BOCC
Date
10/9/2002
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
D.1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oi: <br /> agreement_ However, it will only be changed as the Joint Planning Area Land Use <br /> Map is arriericled if tb Q Map amendments change the location of either the CIDA or the <br /> CRIDA, <br /> E Joint Courtesy Review Area. A portion of the northern Rural Buffer Area bounded on <br /> the east by I-40 and shown as sah on Exhibit A_ <br /> G. Rural Buffer. That portion °Elbe Joint Planning Area designated on the Toint Planning <br /> Area Land Use Map as such and designated in the Joint Planning Area Lid Use Plan <br /> as Rural Residential, Agricultural,Public/Private Open Space, Resource Conscrvationi <br /> Extractive/Di vocal Uso and the ov Erl ay district designated University Lake Watershed <br /> Area. This area is further defined as being alow-density area consisting of single <br /> family homes situated on large lots having a minimum size of two (2) acres, The <br /> Rural Buffer is further defined as land which, although adjacent to an Urban <br /> Transition area, is rural in character and winch will rcmain ntral, contain low-density <br /> residential uses and not require urban services (public uti li ti a and other tomm <br /> services). <br /> H_ Transition Area. That portion of the Joint Planning Area designated_on the Joint <br /> Planning Area Land Use Map as sum This area is further defined as being in <br /> transition from rural to urban or already than in density. Urban services (public <br /> utilities and other town s ices) are now provided to this area or are projected to be <br /> provided to this jai The portion of the Transition Area located in the CJDA shall be <br /> miler divided into Transiticin Area I and Transition Area.11 on the Joint Ftinnins Area <br /> Laid Use Map. The Joint Planning Arca Land Use Plan shall provide that,within <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.