Orange County NC Website
i . <br /> r <br /> poinl. To that end, please address the following under"b": <br /> -Please add the number of units allowed, <br /> -Please claeifY why you have included "2. Density Bonuses 24" (It is staff <br /> ii7 understands that you are allowed more units by density calculation than <br /> you are proposing. With that in mind, you would not need to utilize the <br /> I-I` 'density bonus provisions of the LSO.}, <br /> -please clarify wit is meant by "3. free Units 27." Are you refoning to <br /> ,.4 Ilvelwork units, which would not count towards your density calculation? <br /> if so, please add clarifying language; <br /> 1:;_f:.;:..i.''' <br /> Reply: We have added the number of units allowed under R-20 densily(119) <br /> and those allowed for this project as a VMU(238). E though we tsalize that <br /> 0 . we do not need to use the dny bonus'allocation, we feetthat we should <br /> note the possible allocations only for urciars#arding. We have noted That this <br /> Derisity fxnus allocations is not required." <br /> 'the Free units that were noted should have mad as °`�0°units (instead <br /> This refers to the units located above our storefront use ass. We cep!these <br /> s Live Work Unite INS have noted tha(these Tensity bonus allocations are <br /> not required." <br /> r- <br /> t'..j <br /> �"' S, The Zoning Division suggests that you rethink the pha5inçj plan for the <br /> � project Currently, the plans indicate a 'on' -phase' project• Staff hereby <br /> ki .points out that a multi-phased project would be much more practical <br /> once you are at the point of actual construction. As further explanation, <br /> plea8e note that staff will expect all infrastructure, all amenities and all <br /> buildings to be complete prior to the issuance of a Certificate of <br /> 1] Occupancy (CO) If it remains as a single-phase project If this is not what <br /> you desire, then you must submit a detailed phasing plan including <br /> schedules, phase areas, hew the amenities will be installed by phase, etc: <br /> Staffwould recommend that all of the private roads, s[dewallcs, eta., be <br /> �= :°• <br /> installed as part of phase 1. Final plat approrral will not be granted by <br /> . phase until all improvements within each phase are either installed or <br /> -: bonded. Once installed or bond€d, you can r eirre approval fora final <br /> ,- plat by phase1' #ren subseque ou can be in subsequently receiving building • <br /> permits within that particular phase prior to further final plat <br /> e. <br /> ['•'. When considering this comment, Plewe reference Sections 1 -47, 7540, <br /> t:� and �t�6�1 of the LlJO. Staff is ppY to discuss the matter further at your <br /> request Add+fiionalty. please clarify whether the commando! portion of <br /> -L the project is Intended to be a 'second phase' as currently listed. Both • <br /> the `residential' information (d2) and 'commercial' information ( I} <br /> indicts `7 phase only,' but it is not clear whether you intend one single <br /> y...; phase total or one phase for each portion; <br />