Orange County NC Website
1 ti <br /> 1 K <br /> , <br /> T 7 <br /> 1 <br /> • ii} <br /> 9. Per Section 15-2M of the LUG, Orange County Erosion Control (OCEC) <br /> [71 handles all erosion control review and Inspections for the Town. <br /> -• Preliminary erosion n l approval must be received <br /> 7 <br /> prior to proceeding to a hearing. This is important so that we can ensure <br /> ri r1 that the erosion n l devices can fit within the current plan of <br /> development Please note that the Orange County Erosion Control Office <br /> hers indicatod Zoning Diviiion that they will offer foci comments <br /> • once the second set of plans is submitted; <br /> . a Reply: So noted. <br /> El 10. Per Appendix A. A-6(b)(7) of the LSO, provide a description of the <br /> watercourse*Iteration, if any, proposed for the sum crossing. Provide <br /> details for the culverts/headwalls associated with the crossing. <br /> Reel: We have additibnal inform . See culvert worts and dell <br /> F.:3. <br /> t.,.. <br /> k <br /> r•1. <br /> ' <br /> s . <br /> }• . <br /> 6 <br /> r <br /> I • <br /> CL <br /> Li • <br /> �'f•u <br /> U <br /> , - <br /> 1 <br />