Browse
Search
Agenda - 10-09-2002 - C.1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 10-09-2002
>
Agenda - 10-09-2002 - C.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2017 3:41:59 PM
Creation date
7/26/2017 12:05:23 PM
Metadata
Fields
Template:
BOCC
Date
10/9/2002
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C.1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br /> !.'; <br /> 1.•-i,. . <br /> whether#ham is a curb or sidewalk. <br /> � Rep(y: : oAdv!sed � <br /> [1:1 Copy of Iffier o�credit or warranty bond that shall by in <br /> RY <br /> effect for a period of 15 months to co re r warranty pallated <br /> �.' repairs. iNarranty bond is computed d as of the total cost <br /> of roadwayirigh#-of-way related improvements minus the <br /> r- cost of wrafier and sewer improvements. <br /> Reply: : So Advised <br /> n , . <br /> MASA . <br /> Ted Blake (engineering assialan#) 919.968,4421 ext.249 <br /> Carrboro Zoning Dwhion <br /> 7 '1 laclude the three 30' QJh Sanitary Sewer Easements shown in <br /> d "red" on the enclosed print � . <br /> R. <br /> Please incIud 1�U notes on enclosed sheet entitled "Utility Notes for <br /> i.l'..J �nmore" on w Utility Sheets. <br /> :1 Rep1y:.0VA 4 easements shown on Sheet UP 2. Wil/ add to <br /> �4 <br /> construction plan set. <br /> 0 1. Standards and Specifications-all construction shall be in accordance with <br /> OWASA Standards and:Specifications kdest revised edition. <br /> Reply: <br /> k.j Noted on Sheet L1P 1 (Note 14). <br /> [:3 <br /> 2. ?reconstruction orrfererrce-A preconstruction conference with the <br /> OWASA Construction Inspector is required before any utility <br /> construction. <br /> 7.11 <br /> Reply.' See rrofe#6 on Sheet UP 1.- . <br /> E. 3. Project AcceptanceIri addition lo a Final Inspoction approved by the <br /> . OWASA Consctian inspector, the following documents must be <br /> received and approved by OWASA before acceptance of the project and • <br /> i.l.A the setting of meters: <br /> • Engineer's Certification of Public Sewer.-orlgrnal document <br /> n a Engineer's Certification of Public Water-original document <br /> LI • Asset Letter-original document <br />
The URL can be used to link to this page
Your browser does not support the video tag.