Browse
Search
Agenda - 10-09-2002 - C.1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 10-09-2002
>
Agenda - 10-09-2002 - C.1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2017 3:41:59 PM
Creation date
7/26/2017 12:05:23 PM
Metadata
Fields
Template:
BOCC
Date
10/9/2002
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C.1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 4:'•.5 <br /> 7. Biareterxtian areas #S, #6 and #T appear-to be largely within the stream <br /> buffer and are 6eing cocted Ire fill. T1e streams wi#hln the bu#�ers <br /> �� appear to be relatively stable and therefore should not be Impacted. In <br /> El fact, portions of these strums appear to be usable as reference reaches <br /> for natural stream d. ign1 The impact in these buffers needs to be <br /> removed. <br /> Reply: This has been corrected with the revised pfen. There is no encroachment in <br /> f_:< The stream bufferfr these locations with The revised plan. <br /> 8. Each &the bioretention are should provide quantitic of plants that <br /> 1 il will lie iriatalled for each basin, maintenance schedule, construction <br /> sequence plan view showing placement of drain pipes for each arioa and <br /> location of spillway. <br /> Reply.: The bioreten#iora area has been removed from The stormwater management <br /> plan. <br /> P.'.; <br /> r.... 9. Each of the wetland areas should Provide plant quantltJee for each <br /> -',` wetland, fig grading below normal pool, forebay elevations, weir <br /> elevalions between forebay and pool. <br /> 17/(1 Reply: This has been provided with this revised plan. <br /> 0 . <br /> 1Q.The location of the emergency splIhvay in Wetland #1 does not <br /> allow for <br /> treatment before discharging into Bolin Creek, <br /> Reply_• This has been addressed with the new design <br /> L11.1t appears that Wetland#2 will short circuit based an the location of the <br /> a basin outlet <br /> Reply: This has been addressed with the new design. <br /> 12.The proposed 484 contour at the southeast end of the property extends <br /> t.,, <br /> off the property. . <br /> Reply; This has been addressed with the revised glans. Construcfion easements wit! <br /> [I be obtained ire required <br /> [sue r�,a <br /> r • <br />
The URL can be used to link to this page
Your browser does not support the video tag.