Orange County NC Website
:...'..] . <br /> Cl • <br /> • <br /> E . not encumber the open space pursuant to 15-198(b)(1)(a). . Precedent <br /> hl calls for the area of the open space lot credited toward requirements of <br /> •the ordinance to bet reducad by the area of the structure if this area <br /> If...: cannot meet the intent or definition of open space. . <br /> Reply: This comment has been noted, The aree That contains the new wetianci <br /> adjacent to &&11n Creek meets the purpose of the buffer and is replanted with the <br /> Ii2. required p/an 'igs. • <br /> ;i:') . <br /> i':1 9. Developer is encouraged to minimize the area required d for! stormwatc r <br /> control units by reducing I mporvi oui surface area and maximizing the <br /> use of on-site Infiltration to reduce the requirements for storrnwater <br /> runoff control. <br /> ti <br /> Reply: This has been noted, We have removed all bioretentjon end retention devices <br /> r9 except for one_ We bone that luting our engineerirg document phase we can do <br /> J even better <br /> P. • . <br /> F:::] 10.Abandon driveway to existing house and rovi de access from Hogan <br /> Park drive instead; Maintain the current creek crossing for greenway <br /> 61 • (pedestrian and bike) access only. Might consider driveway as trai I Iiea d <br /> from Homestead Road for public access to greenway (PP.2). <br /> ; Reply_ This has been noted and added to our drawings. . <br /> 'It.There appears to be a second path, separate from the greenway located <br /> •f•R <br /> on the opposite side of creek and parallel to the creel. If this is planned, <br /> .,r� the Bolin Creek corridor ,running through the project would be • <br /> r•� encumbered by (west to east) (1) an existing path (2) OWASA easement, <br /> and (3) greenway path — in addition to containing a soccer field and play <br /> VI field (SP3) Consider alternate ate co nfigu ratio ns i such as co-location of <br /> 1: <br /> paths and O A A easement . to minimize disturbance. O R-1i <br /> .F.% • Reply: We have totally redesigned the trail system for the project_ Please see the <br /> new trait and greenway design. <br /> 4, <br /> Y . <br /> '12.Plan drawings shows playfield at 83,500 square feet, but the recreation <br /> point analysis shows 5 5,485 square feet correct the plans indicating the <br /> 1:1 correct area cal u I ati ens. Provide, d tai I o r wri en note explaining how <br /> the p1ayfield will be graded. how much <br /> r.-_ <br /> I. <br />