Orange County NC Website
PREPARED BY: Karol P.Mack,Associate General Counsel,Duke Energy Corporation <br /> Mail To: Duke Energy Carolinas,LLC Site: 001249 <br /> Data&Document Management Land Unit: 1695239 <br /> 550 S.Tryon St.,DEC22A Project No: 001249-45867 <br /> Charlotte,NC 28202 <br /> STATE OF NORTH CAROLINA <br /> EASEMENT <br /> COUNTY OF ORANGE <br /> THIS EASEMENT is granted this _ day of , 20_, by ORANGE COUNTY, <br /> NORTH CAROLINA, having a mailing address of Post Office Box 818 Hillsboro, North Carolina 27278 <br /> ("Grantor"), and DUKE ENERGY CAROLINAS,LLC,a North Carolina limited liability company, having a <br /> mailing address of Data&Document Management, 550 S. Tryon St.DEC22A, Charlotte,North Carolina 28202 <br /> ("DEC'); <br /> WITNESSETH: <br /> That Grantor, in consideration of Ten Dollars ($10.00) and other valuable considerations paid by DEC, <br /> the receipt and legal sufficiency of which is hereby acknowledged, does grant and convey unto DEC, its <br /> successors and assigns, the perpetual easements and rights of way set forth herein, for the purposes and subject <br /> to the terms and conditions set forth herein, over and across the land of Grantor (the "Premises") lying in the <br /> State and County aforesaid and being more particularly described in the instrument recorded in Book 4247, <br /> Page 413,Orange County Registry. <br /> As used herein,the term"Right of Way Strip" shall mean those areas or parcels of land containing 0.46 <br /> acres,all as shown on a plat of survey entitled "ROW Easement Exhibit Duke Energy Carolinas LLC," dated <br /> May 8, 2017, marked Map: 001249-458267, said plat being attached hereto as Exhibit A and incorporated <br /> herein by reference. <br /> The easement and right of way herein granted by Grantor to DEC, its successors and assigns, over the <br /> Premises is subject to the following terms and conditions: <br /> (a) DEC's Use of Right of Wasp. Grantor grants to DEC,its successors and assigns, a perpetual <br /> easement to enter upon the Premises within the Right of Way Strip (as defined herein) to <br /> construct, reconstruct, replace, rebuild, enlarge, modify, remove, inspect, repair, maintain, <br /> operate, and use within the Right of Way Strip multiple lines for transporting electrical energy <br /> Orange County 5.23.17 1 <br />