Browse
Search
Agenda - 08-26-2002 - C-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 08-26-2002
>
Agenda - 08-26-2002 - C-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2017 12:21:49 PM
Creation date
7/18/2017 12:06:51 PM
Metadata
Fields
Template:
BOCC
Date
8/26/2002
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C-1
Document Relationships
Minutes - 20020826
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
PH ORD-2002-023 Telecommunication Tower Ordinance Amendment
(Linked To)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC HEARING RDI IAI CE (DRAFT) <br /> 1 <br /> 0 2 1 <br /> k) All abandoned communication towers shall be removed within 12 months <br /> of the cessation of use. A bond or other security guaranteeing the <br /> removal of the tower in the event that it is abandoned or unused for a <br /> period of 12 months shall be posted. A cost estimate shall be provided <br /> by a qualified contractor. The amount of the security shall be 110 <br /> percent of the estimate. <br /> I) A determination shall be made that the facility and its equipment will <br /> comply with all federal, state and local emission requirements,and the <br /> Special Use Permit shall include a statement that the facility and its <br /> equipment will comply with all federal, state and local emission <br /> requirements. <br /> m) The Special Use Permit shall include a condition that the electro- <br /> magnetic radiation levels maintain compliance with requirements of the <br /> FCC,regarding <br /> electromagnetic radiation. Within 30 days of installation of equipment on <br /> the tower,and within 30 days of the installation of any additional <br /> equipment in the future,the tower owner shalt provide documentation of <br /> emission levels in relation to FCC standards. in addition, the tower <br /> owner must provide documentation of emission levels within five working <br /> days if so requested by Orange County. Orange County may make such <br /> requests at any time,not to exceed four times per year. <br /> r� High voltage and "No Trespassing"and other warning signs. <br /> I If high voltage is necessary for the operation of the <br /> telecommunications tower or any accessory structures, <br /> "HIGH VOLTAGE -DANGER"warning signs shall be <br /> permanently attached to the fence or wall and shall be <br /> spaced no more than forty(40)feet apart. <br /> 2) "NO TRESPASSING"warning signs shall be permanently <br /> attached to the fence or wall and shall be spaced no more <br /> than forty(40)feet apart. <br /> 3) The letters for the "HIGH VOLTAGE -DANGER"and "NO <br /> TRESPASSING"warning signs shall be at least six(6 <br /> inches in height. The two(2)warning signs may be <br /> combined into one CO sign. The warning signs shall be <br /> installed at least five feet above the finished grade of the <br /> fence. <br /> 4) The warning signs may be attached to freestajnding poles if <br /> the content of the signs may be obstructed by landscaping. <br /> 5) Signs noting federal registration (if required)shall be <br /> attached to the tower structure in compliance with federal <br /> regulation. <br /> + Equipment storage. Mobile or immobile equipment not used in <br /> direct support of a tower facility shall not be stored or parked on <br /> the site of the telecommunication tower,unless repairs to the tower <br /> are being made. <br /> GATKingiTawer Ord2C411 Tower Ordinance I evS <br />
The URL can be used to link to this page
Your browser does not support the video tag.