Browse
Search
Agenda - 08-26-2002 - C-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2002
>
Agenda - 08-26-2002
>
Agenda - 08-26-2002 - C-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2017 12:21:49 PM
Creation date
7/18/2017 12:06:51 PM
Metadata
Fields
Template:
BOCC
Date
8/26/2002
Meeting Type
Public Hearing
Document Type
Agenda
Agenda Item
C-1
Document Relationships
Minutes - 20020826
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2002
PH ORD-2002-023 Telecommunication Tower Ordinance Amendment
(Linked To)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ <br /> PUBLIC HEARING ORDINANCE (DRAFT) <br /> 0 I 3 <br /> e) Tower Inspection. <br /> 1) Telecommunication tower owners shall submit a <br /> report to the County Inspections Division certifying <br /> structural and electrical integrity upon completion of <br /> the initial construction and at intervals as specified <br /> in this Section <br /> 2) Inspection records shall be kept by the tower owner <br /> and made available upon request to the Inspections <br /> Division during regular business hours. <br /> a) At least once every thirty-six(36) months, a <br /> structural engineer who is regularly involved <br /> in the maintenance, inspection and/or <br /> erection of telecommunication towers shall <br /> inspect the tower and submit a report <br /> submitted to the Inspections Division within <br /> a reasonable time thereafter. At a minimum, <br /> this inspection shall be conducted in <br /> accordance with the provisions of this <br /> Ordinance and in accordance with the tower <br /> inspections check list provided in the EIA- <br /> 222(as amended from time to time).This is <br /> considered a major inspection review. <br /> b) At least once every twelve(12) months, a <br /> visual inspection from the ground shall be <br /> conducted by a properly trained staff <br /> member or tower consultant and a report <br /> shall be filed with the Inspections Division <br /> within a reasonable time thereafter.This <br /> inspection shall include, but shall not be <br /> limited to,visual inspection of tower <br /> foundations,structures,guys,and <br /> connections for evidence of settlement or <br /> later movement; soil erosion; condition of <br /> paint or galvanizing; rust or corrosion, loose <br /> or missing bolts, loose or corroded lightning <br /> protection connectors;tower plumbness, <br /> significant variation in guy sags i.e. <br /> tensions),and other material areas or <br /> matters relating to the structural integrity of <br /> the tower.This is considered a minor <br /> inspection review. <br /> GATKIndcrower Ord2kCell Tower Ordinance Rev8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.