Browse
Search
2017-319-E AMS - Tibbens Construction to repair sagging sewer line at Animal Services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-319-E AMS - Tibbens Construction to repair sagging sewer line at Animal Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2018 12:41:27 PM
Creation date
7/18/2017 8:46:57 AM
Metadata
Fields
Template:
Contract
Date
7/10/2017
Contract Starting Date
7/10/2017
Contract Ending Date
9/30/2017
Contract Document Type
Agreement - Construction
Amount
$35,592.00
Document Relationships
R 2017-319-E AMS - Tibbens Construction to repair sagging sewer line at Animal Services
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:8A89705C-498E-4AB2-A ■97-D86209095601 <br /> Work will be performed as determined at Pre-Construction meeting prior to <br /> starting work. <br /> Permits will not be required if work is performed under the existing Single <br /> Occupancy Restroom permit (2017-14316). Change of the original scope of work <br /> is all that is required with the Town of Chapel Hill inspections department using <br /> the existing permit. <br /> Proposal is to be awarded in two portions: <br /> (1) $10,000.00 in Fiscal Year 2016 <br /> (2) $25,592.00 in Fiscal Year 2017 <br /> Total: $35,592.00 <br /> All of the work is to be completed in a substantial and workman like manner for the sum <br /> of Thirty-Five Thousand Five Hundred Ninety-Two Dollars ($35,592.00). Payment to be <br /> made as the work progresses to the value of One hundred percent (100%) of all work <br /> completed. The entire amount of the contract is to be paid within 5 days after <br /> completion. <br /> Any alterations or deviation from the above specifications involving extra cost of <br /> material or labor will be executed upon written order for same, and will become an extra <br /> charge over the sum mentioned in this contract. All agreements must be made in <br /> writing. <br /> Authorized <br /> Signature Mark Tibbens <br /> ACCEPTANCE <br /> You are hereby authorized to furnish all materials and labor required to complete the <br /> work mentioned in the above proposal for which Owner agrees to pay the amount <br /> mentioned in said proposal and according to the terms thereof. <br /> Signature Date <br /> www.socrates.com Page 2 of 2 SS4301-340•Rev.05/04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.