Browse
Search
2017-317-E AMS - Tibbens Construction to install protective cages around HVAC condensate drain lines in gym, etc.
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-317-E AMS - Tibbens Construction to install protective cages around HVAC condensate drain lines in gym, etc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2018 12:38:12 PM
Creation date
7/18/2017 8:31:05 AM
Metadata
Fields
Template:
Contract
Date
7/17/2017
Contract Starting Date
7/17/2017
Contract Ending Date
9/30/2017
Contract Document Type
Agreement - Construction
Amount
$2,118.35
Document Relationships
R 2017-317-E AMS - Tibbens Construction to install protective cages around HVAC condensate drain lines in gym, etc.
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:6EC4E1AF-9212-4BF4-ACB8-3C5C4BDEE3CD <br /> Proposal #1004 <br /> FROM: Tibbens Construction Page. No. 1 of 1 <br /> 849 Moose Tracks Trl. <br /> Cedar Grove NC 27231 <br /> 919-643-2856 c#919-667-5366 <br /> PROPOSAL SUBMITTED TO: <br /> Name: Orange County NC. (Cedar Grove Community center) <br /> Phone: 919-610-8182 Asset management <br /> Street: PO box 8181 <br /> City: Hillsborough <br /> State: NC. 27278 <br /> Provide and install 2- 2' x 4' x 4' to 6' long protective screens over A/C lines at two NC units in <br /> gymnasium ceiling as discussed at site visit. <br /> Provide and install two protective screens over two thermostats in gymnasium as discussed at <br /> site visit. <br /> $1092.35 <br /> Provide and install approx. 23' of art rail and attachments to match existing at front entrance <br /> corridor as discussed at site visit. <br /> $1026.00 <br /> All of the work is to be completed in a substantial and workman like manner for the sum of <br /> ($2,118.35). Payment to be made each week as the work progresses to the value of One <br /> hundred percent (100%) of all work completed. The entire amount of the contract is to be paid <br /> within 5 days after completion. <br /> Any alterations or deviation from the above specifications involving extra cost of material or <br /> labor will be executed upon written order for same, and will become an extra charge over the <br /> sum mentioned in this contract. All agreements must be made in writing. <br /> Authorized Signature Mark Tibbens <br /> ACCEPTANCE <br /> You are hereby authorized to furnish all materials and labor required to complete the work <br /> mentioned in the above proposal for which Owner agrees to pay the amount mentioned in said <br /> proposal and according to the terms thereof. <br /> 1-3-17 <br /> Signature Date <br /> www.socrates.com Page 1 of 1 SS4301-340•Rev.05/04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.