Orange County NC Website
DocuSign Envelope ID: B5986604-2420-4A6E-BD13-01F64E43BD25 <br /> [Departmental Use Only] <br /> TITLE Standby Generator Installation <br /> FY 2017-18 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT OVER$250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the 6th day of <br /> July, 2017, by and between National Power Corporation, (hereinafter called the "Contractor"), and Orange <br /> County, a political subdivision of the State of North Carolina, (hereinafter called the "County," "Orange <br /> County," or"Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the General Conditions which are fully <br /> incorporated in this Agreement, the Request for Proposals, designer approved communications and/or field <br /> orders, the Proposal, Construction Documents and Drawings and Written Specifications, and the terms and <br /> conditions of sale. The Contract Documents form the Contract. In the event of any inconsistency between or <br /> among the Contract Documents the Contract Documents shall be interpreted in the following order of priority: <br /> a. This Agreement and incorporated General Conditions attached as Exhibit 1. <br /> b. Designer approved and stamped construction documents and drawings and written <br /> specifications. <br /> c. Designer approved communications and/or field orders. <br /> d. Request for Proposals and addenda thereto. <br /> e. Proposal-Custom Quote Dated April 28, 2017. <br /> f. National Power Corporation Terms and Conditions of Sale. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform, and be fully responsible <br /> for all of the Work required by this Agreement within the time period stipulated in a written Notice-to-Proceed <br /> to be executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by N/A <br /> b. Written specifications prepared by the designer. <br /> c. Contractor generator fabrication and installation proposal dated April 28, 2017, itemized by <br /> Revised 2/17 1 <br />