Browse
Search
2017-234-E Planning - Palmer Generator to replace, install new generator controller, program, transfer switch at Brookhollow Pump Station
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-234-E Planning - Palmer Generator to replace, install new generator controller, program, transfer switch at Brookhollow Pump Station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 1:37:52 PM
Creation date
6/23/2017 8:40:30 AM
Metadata
Fields
Template:
Contract
Date
6/23/2017
Contract Starting Date
6/23/2017
Contract Ending Date
8/31/2017
Contract Document Type
Contract
Amount
$1,974.08
Document Relationships
R 2017-234-E Planning - Palmer Generator to replace, install new generator controller, program, transfer switch at Brookhollow Pump Station
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:51F879E8-7702-4D23-B2F8-FA67BE720A84 <br /> Palmer Generator Estimate <br /> 3673 ALAMANCE ROAD <br /> BURLINGTON, NC 27215 US <br /> (336) 270-4824 <br /> todd @palmergenerator.com <br /> www.palmergenerator.com PALMER <br /> GENERATOR <br /> All)II)II tII SS S11111111' II I <br /> Allison Reinert Allison Reinert <br /> Orange County- Planning & Orange County- Planning & <br /> Inspections Dept Inspections Dept <br /> P.O. Box 8181 131 W. Margaret Lane <br /> Hillsborough, NC 27278 Hillsborough, NC 27278 <br /> S II IRAIA III IIII All 11 l <br /> 1278 06/12/2017 <br /> AAII IIA11 if 0 1A00 II AllA 101.01N II <br /> Industrial Labor:Labor 1 105.00 105.00 <br /> Labor to replace existing controller, install new controller and program. <br /> Industrial Labor:Trip Charge 1 125.00 125.00 <br /> Trip charge <br /> GM93604 1 1,744.08 1,744.08 <br /> MPAC 1500 Standard Transition <br /> TOTAL $1 ,974.08 <br /> Accepted By Accepted Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.