Orange County NC Website
DocuSign Envelope ID: 18C4E672-1 DB7-4020-9D85-083D0D588F92 <br /> Exhibit A: Project Specifications for Sewer Line Cleaning and Video Recording <br /> Overview <br /> It is the intent of these specifications to provide enough information for a Contractor with the <br /> proper equipment to clean the gravity sewer lines and produce a video (DVD) after cleaning that shows <br /> the condition of the inside of the lines. <br /> For this project, Orange County will supply the following: <br /> • A map of the lines to be cleared — Exhibit B <br /> • A water source, likely a hydrant on the Orange Alamance Water System (OAWS) in the vicinity of <br /> the lines to be cleaned. <br /> • Coordination with and by our sewer maintenance entity, the City of Mebane, to control pump <br /> station operations such that they do not interfere with your sewer cleaning operation. <br /> • Coordination with the City of Mebane to allow the disposal of waste from the cleaning process at <br /> the City of Mebane Wastewater Treatment Plant at no charge. <br /> • Notification to all the Efland Sewer customers that line cleaning and video recording will be taking <br /> place. <br /> The Contractor will be expected to provide all equipment and labor to clean and video the specified <br /> gravity sewer lines of the sewer system, as described more completely below. The selected Contractor <br /> will be responsible for maintaining a safe working environment and adhering to all confined space and/or <br /> sewer work requirements. <br /> SCOPE OF WORK <br /> Cleaning <br /> This project consists of cleaning and videoing (CCTV) 8" gravity sewer lines. The project is divided into <br /> three (3) phases as followings: <br /> • Phase 3 — approximately 7,300 linear feet <br /> • Phase 4 — approximately 5,600 linear feet <br /> • Phase 5 — approximately 5,900 linear feet <br /> Some of the lines to be cleaned are off-road, in cross-country easements. These easements will be <br /> cleared prior to cleaning and will be passable, i.e. stumps will be cut to ground level and overhanging <br /> limbs will be removed, but there is no "road" along the easement. Contractors interested in bidding the <br /> project are encouraged to investigate the project area beforehand and bid accordingly. <br /> Water for cleaning will be supplied by Orange County, most likely from a nearby hydrant. The hydrant <br /> does not belong to Orange County, but rather to the Orange-Alamance Water System (OAWS). There <br /> will be no charge to the contractor for the water used, but the contractor will need to coordinate with <br /> OAWS to get a water meter installed on the hydrant they will use and record the amount of water used <br /> and will need to coordinate the withdrawal of water with OAWS directly. <br /> Sewer line cleaning shall be performed to remove foreign material from the sanitary sewer lines for clear <br /> viewing of the interior surface of the pipe during the video inspection and restore the pipe to at least 95% <br /> original capacity. <br /> Conditions discovered in the pipe, such as protruding pipes, blockages, roots, etc. that can be removed <br /> by conventional means, e.g. cutting, should be removed by the Contractor as part of the performance of <br />