Browse
Search
2017-229-E AMS - Triangle Landscaping, Inc. for Veterans Memorial Phase 1 Construction
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-229-E AMS - Triangle Landscaping, Inc. for Veterans Memorial Phase 1 Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2018 2:09:00 PM
Creation date
6/20/2017 3:00:31 PM
Metadata
Fields
Template:
Contract
Date
6/20/2017
Contract Starting Date
6/20/2017
Contract Ending Date
12/31/2017
Contract Document Type
Agreement - Construction
Amount
$13,370.00
Document Relationships
R 2017-229-E AMS - Triangle Landscaping, Inc. for Veterans Memorial Phase 1 Construction
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 586E2A42-AE8D-4C6D-A276-C4A22C16ADD7 <br /> Triangle Landscaping Inc. Estimate <br /> PO Box 144 <br /> Stem,NC 27581 Date Estimate# <br /> 5/24/2017 337 <br /> Name/Address <br /> Orange County Asset Management Services <br /> 131 West Margaret Lane <br /> Hillsborough,NC 27278 <br /> Project <br /> Description Qty Cost Total <br /> Orange County Veterans Memorial(L-2.A) <br /> 70 Tons of ABC Stone and Delivery 70 30.00 2,100.00 <br /> 30 Tons of Chapel Hill Gravel and Delivery 30 40.00 1,200.00 <br /> One roll of Non woven fabric to be placed under stone 300.00 300.00 <br /> Tree protection,signs and stakes 270.00 270.00 <br /> Flag Pole 2,500.00 2,500.00 <br /> Signage Package 1,000.00 1,000.00 <br /> Labor and Machines to dig out path and place back stone and gravel 6,000.00 6,000.00 1,-- <br /> Labor and Materials to set Flag Pole and Signs it 3 2,470.00 —2;470:00-° <br /> Total <br /> $15,840.00 <br /> Customer Signature <br /> 4 L <br /> to / <br /> rr <br /> p � � <br />
The URL can be used to link to this page
Your browser does not support the video tag.