Orange County NC Website
DocuSign Envelope ID:813A5323-29B6-4DDD-A2B8-22B7F4A4A68C <br /> 11. Does the current$0.60 I pound rate alluded to in the pre-bid meeting include transportation <br /> of wastes? <br /> Yes it includes transportation,$0.60 per pound includes everything except labor. <br /> 12. Is one contractor currently providing all of these services both onsite collection and disposal? <br /> Are you planning on continuing this for the new contract? <br /> The current contractor is providing everything;onsite collection, hauling and disposal. We are <br /> planning on the new contractor continuing all of those services. We need to be made aware of any <br /> subcontractors that are used and the subcontractors must be approved by us beforehand. <br /> 13. Does the county provide the container utilized to package the waste or will the pricing <br /> submitted for disposal need to include packaging <br /> The current pricing includes everything except labor. Collection, hauling, processing,.disposing,and <br /> all of the material used on site including tools, boxes,55 gallon drums, etc. <br /> 14. Will the contractor have storage onsite at the collection location for equipment and supplies? <br /> If yes what type of building and what is the area, i.e.what is the storage capacity? <br /> The storage facility at 1514 Eubanks Road has a shelter for employees,a large processing area and <br /> two storage buildings. One building is 12'x 16'and the other is 14'x 20'.There is also a covered <br /> area with secondary containment that is used for storage that is about 13'x20'. <br /> 15. Please provide drawings or diagrams of the existing HHW storage area. <br /> See Attached (1514 Eubanks Road Facility).We currently only have large blue prints of the <br /> processing building.The illustration provided is a rough sketch of the location. If you need the <br /> . exact blue print of the processing building please let us know. <br /> 16. You have a single per lb unit price in the bid schedule for Household Hazardous Waste <br /> collection and processing, is this unit price to include everything except the onsite per labor rate? <br /> In other words are we to include disposal, packaging,transportation,testing and all other costs <br /> under this single per lb unit price for all waste categories? <br /> The per pound price includes everything except labor. <br /> 17. What was the total contract spending on the current HHW contract in each of the last two <br /> complete fiscal years? - <br /> FY 0910=$166,290.90 and FY 1011 $159,003.60. <br /> 18. Are lamps included in the collection service and if so does it include all categories of lamps <br /> compact fluorescent, straight fluorescent, HID,and incandescent, etc? <br /> Orange County will be handling all Lamps.The HHW Vendor will not be responsible for handling <br /> them. <br /> Page 3 of 5 <br />