Orange County NC Website
5 <br /> Moore County <br /> • Maple Ave sidewalks, crosswalks, bulb-outs, and railroad crossing improvements in Aberdeen, <br /> from US 1 to Pine Street <br /> • Mike Place sidewalks in Aberdeen,from Magnolia Dr to Johnson St <br /> • Poplar St multi-use path in Aberdeen/Southern Pines,from Peach St to US 1/Pinehurst Ave <br /> • Midland Rd greenway in Pinehurst/Southern Pines, from Airport Rd to Dr. Neal Rd <br /> • Airport Rd greenway in Pinehurst/Southern Pines,from Midland Rd to Forest Creek <br /> Greenway/Knoll Road Greenway <br /> • Pee Dee Rd greenway in Southern Pines, from Pine St to Central Dr (NC 22) <br /> • Central Dr greenway in Southern Pines, from Pee Dee Rd to Reservoir Greenway <br /> TRANSIT(2 Projects) <br /> Chatham County <br /> • Additional demand-response vehicles for Chatham Transit <br /> Orange County <br /> • Two vehicles for deviated fixed route service in rural northern and western Orange County <br /> AVIATION (12 Projects) <br /> Lee County <br /> • Build airplane run-up lane at both ends of taxiway at Raleigh Executive Jetport <br /> • Replace PAPIs with new LED lights and replace MALSRs/install RDR signs at Raleigh Executive <br /> Jetport <br /> • Build new taxi lane connecting south ramp road and all taxi lanes on Ammons Farm Rd side of T- <br /> hangars at Raleigh Executive Jetport <br /> • Land acquisition for future airport development at Raleigh Executive Jetport <br /> • Develop new aviation related business areas east of Raleigh Executive Jetport <br /> • New terminal building and improvements at Raleigh Executive Jetport <br /> • Construct new airplane storage box hangar at Raleigh Executive Jetport <br /> • East-west road on airport for on-site accessibility at Raleigh Executive Jetport <br /> • Control tower at Raleigh Executive Jetport <br /> • Extend runway from 6500 feet to 8500 feet at Raleigh Executive Jetport <br /> • Replace existing 8-foot airport perimeter fence with 10-foot perimeter wildlife fence at Raleigh <br /> Executive Jetport <br /> • T-hangar taxilane pavement rehabilitation/strengthening at Raleigh Executive Jetport <br /> TARPO Prioritization Subcommittee Draft Project List for Prioritization 5.0—May 1, 2017 3 <br />