Browse
Search
Agenda - 06-20-2017 - 8-h - Efland Sewer to Mebane, Phase 2 Extension – Construction Engineering and Inspection Services Contract for the Efland-Buckhorn-Mebane Utility Planning Area
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 06-20-2017 - Regular Mtg.
>
Agenda - 06-20-2017 - 8-h - Efland Sewer to Mebane, Phase 2 Extension – Construction Engineering and Inspection Services Contract for the Efland-Buckhorn-Mebane Utility Planning Area
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2017 4:33:33 PM
Creation date
6/16/2017 3:53:47 PM
Metadata
Fields
Template:
BOCC
Date
6/20/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8h
Document Relationships
Minutes 06-20-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
47 <br /> claim for damages by the Owner for any breach of this Agreement or a waiver of any other required compliance with this Agreement by <br /> the Designer. <br /> 11.5.2 Owner and Designer mutually waive any claim against each other for consequential damages. Consequential Damages include: <br /> A. Damages incurred by Owner for loss of use,income,financing,or business. <br /> B. Damages incurred by Designer for office expenses,including personnel,loss of financing,profit,income,business, <br /> damage to reputation,or any other non-direct damages. <br /> ARTICLE 12 <br /> ADDITIONAL PROVISIONS <br /> 12.1 Confidentiality <br /> 12.1.1 The Designer and its Consultants shall use their best efforts not to disclose or permit the disclosure of any confidential <br /> information relating to the Project,except to its agents,employees and other consultants who need such confidential information in <br /> order to properly perform their duties relative to this Agreement. <br /> 12.2 Limitation and Assignment <br /> 12.2.1 The Owner and the Designer each bind themselves,their successors,assigns and legal representatives to the terms of this <br /> Agreement.Neither the Owner nor the Designer shall assign or transfer its interest in this Agreement without the written consent of the <br /> other. <br /> 12.3 Governing Law <br /> 12.3.1 This Agreement and the duties,responsibilities,obligations and rights of respective parties hereunder shall be governed by the <br /> laws of the State of North Carolina. <br /> 12.4 Dispute Resolution <br /> 12.4.1 Any dispute arising under pursuant to the Project shall be addressed under the terms of the Dispute Resolution Rules and <br /> Procedures for Orange County Design,Building Construction,Renovation,and Repair Projects. These rules and regulations are available <br /> upon request. <br /> 12.4.2 Any and all suits or actions to enforce,interpret or seek damages with respect to any provision of,or the performance or non- <br /> performance of,this Agreement shall be brought in the General Court of Justice of North Carolina sitting in Orange County,North <br /> Carolina,and it is agreed by the parties that no other court shall have jurisdiction or venue with respect to such suits or actions. <br /> 12.5 Extent of Agreement <br /> 12.5.1 This Agreement represents the entire and integrated agreement between the Owner and the Designer and supersedes all prior <br /> negotiations,representations or agreements,either written or oral.This Agreement may be amended only by written instrument signed <br /> by both the Owner and the Designer. <br /> 12.6 Severability <br /> 13 <br /> Revised 3/16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.