41 <br /> the item of information,approval or decision should be communicated to the Designer.The Owner shall always have a reasonable time <br /> within which to provide such item of information,approval or decision and shall not have any responsibility for any delay occurring by <br /> reason of the Owner's being unable,through no fault of the Owner,to supply such item of information,approval or decision. <br /> 6.1.3 Should the Owner determine that the Designer is behind schedule,it may require the Designer to expedite and accelerate its <br /> efforts,including providing additional manpower and/or overtime,as necessary,to perform its services in accordance with the Key <br /> Milestone Listing at no additional cost to the Owner. <br /> 6.1.4 The commencement date for the Designer's Basic Services shall be the date of delivery to the Designer from the Owner of a fully <br /> executed original of this Agreement. <br /> 6.2 Adjustments to the Schedule <br /> 6.2.1 If the Designer's work on the Project is or will be delayed for more than sixty(60)days through no fault of the Designer,or if the <br /> Owner increases or decreases the scope or size of the Project by ten percent(10%)of currently estimated Total Project Cost,the <br /> Designer shall give prompt written notice to the Owner.Provided that such notice has been given,the Designer may request in writing <br /> an adjustment in the Key Milestone Listing dates,which shall be granted by the Owner to the extent reasonable. <br /> ARTICLE 7 <br /> DESIGNER'S COMPENSATION <br /> 7.1 Compensation for Basic Services <br /> 7.1.1 Compensation for Basic Services shall include all compensation due the Designer from the Owner for all services under this <br /> Agreement except for Additional Services and Reimbursable Expenses. <br /> 7.2 Breakdown of Compensation for Basic Services <br /> Compensation for Basic Services consists of the following compensation for the following separate categories of services: <br /> 7.2.1 Schematic Design Phase.Lump sum fee of <br /> 7.2.2 Design Development Phase.Lump sum fee of <br /> 7.2.3 Construction Document Phase.Lump sum fee of <br /> 7.2.4 Bidding and Contract Award.Lump sum fee of <br /> 7.2.5 Construction Phase.Lump sum fee of <br /> 7.2.6 Post Construction Phase.Lump sum fee of <br /> 7.2.7 Additional Basic Services(Select all that apply): <br /> ❑Programming.Lump sum fee of <br /> ❑Master Planning.Lump sum fee of <br /> 7 <br /> Revised 3/16 <br />