Browse
Search
Agenda - 06-20-2017 - 8-h - Efland Sewer to Mebane, Phase 2 Extension – Construction Engineering and Inspection Services Contract for the Efland-Buckhorn-Mebane Utility Planning Area
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 06-20-2017 - Regular Mtg.
>
Agenda - 06-20-2017 - 8-h - Efland Sewer to Mebane, Phase 2 Extension – Construction Engineering and Inspection Services Contract for the Efland-Buckhorn-Mebane Utility Planning Area
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2017 4:33:33 PM
Creation date
6/16/2017 3:53:47 PM
Metadata
Fields
Template:
BOCC
Date
6/20/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8h
Document Relationships
Minutes 06-20-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
36 <br /> 2.1 Definitions <br /> 2.1.1 Additional Services-See Section 1.1.4 and Article 5. <br /> 2.1.2 Basic Services-See Article 4 and Attachment B. <br /> 2.1.3 Certificate of Final Completion-See the General Conditions of Orange County's Standard Construction Agreement with <br /> contractors. <br /> 2.1.4 Compensation for Basic Services-See Section 7.1 and 7.2. <br /> 2.1.5 Consultants-See Section 3.3.1 and Attachment E. <br /> 2.1.6 Board of County Commissioners-The Board of Commissioners of Orange County North Carolina. <br /> 2.1.7 County Manager-The employee of Orange County bearing that title. <br /> 2.1.8 Milestone Dates-See Attachment D. <br /> 2.1.9 Project-All phases of the Project as described in Section 1.1.1 and Attachments A and B including but not limited to the <br /> schematic design,design development,construction document,bidding and contract award,construction and post-construction phases. <br /> 2.1.10 Reimbursable Expenses-See Section 7.5. <br /> 2.1.11 Total Project Cost-See Section 4.2.1 <br /> ARTICLE 3 <br /> RESPONSIBILITIES OF THE DESIGNER <br /> 3.1 Services to be Provided. <br /> 3.1.1 The Designer shall provide the Owner with all professional services required to satisfactorily complete all phases of the Project <br /> within the time limitations set forth herein and in accordance with the highest professional standards.Such services may include(select <br /> all that apply): <br /> ❑Architectural programming <br /> ❑Master planning <br /> ❑Space planning <br /> ❑Evaluation and analysis of the site or sites <br /> ❑Architectural design <br /> ❑Civil engineering <br /> ❑Structural engineering <br /> 2 <br /> Revised 3/16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.