Browse
Search
Agenda - 06-20-2017 - 8-h - Efland Sewer to Mebane, Phase 2 Extension – Construction Engineering and Inspection Services Contract for the Efland-Buckhorn-Mebane Utility Planning Area
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 06-20-2017 - Regular Mtg.
>
Agenda - 06-20-2017 - 8-h - Efland Sewer to Mebane, Phase 2 Extension – Construction Engineering and Inspection Services Contract for the Efland-Buckhorn-Mebane Utility Planning Area
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2017 4:33:33 PM
Creation date
6/16/2017 3:53:47 PM
Metadata
Fields
Template:
BOCC
Date
6/20/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8h
Document Relationships
Minutes 06-20-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
31 <br /> 8. Please complete the attached E-Verify Affidavit and Iran Divestment affidavit and read the <br /> County's Living Wage Policy <br /> Section VIII: Potential evaluation criteria <br /> 1. Demonstrated success on projects of similar scope and completed without major legal or <br /> technical problems and under budget; <br /> 2. Qualifications of individuals assigned to the project team, including subconsultants; <br /> 3. Relevant governmental experience (North Carolina experience preferred); <br /> 4. Capacity of firm and key project personnel to complete this project in a timely manner, <br /> considering other work on the board; <br /> 5. Experience working with Govt'l entities on land use requirements; <br /> 6. Demonstrated history of bringing projects in under budget <br /> 7. Relevant and easily understood response to proposal; and interview <br /> 8. DBE, minority and women-owned businesses participation and outreach <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.