Orange County NC Website
28 <br /> 6. Submit all completed permit applications and regulatory review packages <br /> PROJECT TIME LINE: <br /> 1. Analysis, Design/Bid Phase: As quickly as possible — schedule to be determined by selected <br /> firm/team <br /> 2. Construction Phase: To begin no later than July 1, 2017 <br /> 3. Construction Duration: 14 months from Notice to Proceed <br /> 4. Post-Construction Phase: Record (as-built) drawings and other post-construction engineering <br /> activities shall be completed within 45 days of the end of the Construction Phase. <br /> Section II - Information About the Firm and Experience <br /> All respondents are requested to provide the information cited below, as well as any supplemental <br /> information that provides a comprehensive view of the prime consultant, the proposed project team <br /> and the approach to this project. The information should be presented in a clear, organized and <br /> concise manner on two-sided paper. <br /> A. General overview of the firm and its experience relative to this project, highlighting experience <br /> working for Orange County or in Orange County. <br /> B. Describe which office will be performing the work for the prime consultant. <br /> C. Specifically address the firm's experience in working with stakeholders and speak to the <br /> composition of those groups (staff, citizens, customer, elected officials, etc.). <br /> D. Note specific project experience with a minimum of five (5) completed projects similar in scope, <br /> providing for each the following information (SF255 or SF330 format acceptable): <br /> 1. Project name. <br /> 2. Description, including year completed, location, utility type, length/size of lines, number and <br /> capacity of pump stations, and your scope of services provided. <br /> 3. Include a complete list of subconsultants and their role/scope of work in the project. <br /> 4. Approximate total cost and cost of that portion for which your firm was responsible. <br /> 5. Project team involved and specific responsibilities. <br /> 6. Client reference and contact information (name of owner's representative, telephone number <br /> and e-mail address) <br /> E. Address the firm's current workload and how this project would fit within the firm's existing work. <br /> Section III - Information About the Proposed Project Design Team <br /> A. Prime Consultant - List the proposed design team and, at a minimum, the following information for <br /> each: <br /> 1. Role/project responsibility on this project team. <br /> 2. Physical location of each team member. <br /> 3. Qualifications. <br /> 4. Education. <br /> 5. Professional registration, if any. <br /> 6. Relative experience, with specific focus on governmental projects. <br /> 7. Length of service with present firm. If less than two years, cite name of previous firm. <br /> 8. List relative projects completed by each team member during the past five (5) years, complete <br /> with the same information as outlined in Section II. Denote any of the listed projects that were <br /> completed when team member was employed by other than the current firm. <br /> 9. Specifically address each team member's experience working with municipalities on similar <br /> projects. <br /> 6 <br />