Browse
Search
Agenda - 06-20-2017 - 8-h - Efland Sewer to Mebane, Phase 2 Extension – Construction Engineering and Inspection Services Contract for the Efland-Buckhorn-Mebane Utility Planning Area
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 06-20-2017 - Regular Mtg.
>
Agenda - 06-20-2017 - 8-h - Efland Sewer to Mebane, Phase 2 Extension – Construction Engineering and Inspection Services Contract for the Efland-Buckhorn-Mebane Utility Planning Area
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2017 4:33:33 PM
Creation date
6/16/2017 3:53:47 PM
Metadata
Fields
Template:
BOCC
Date
6/20/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8h
Document Relationships
Minutes 06-20-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27 <br /> 4. Construction Material and Geotechnical Testing <br /> a. Independent geotechnical and material testing services will be provided on an "on-call" basis, with a 24- <br /> hour notice to schedule services with a subconsultant. <br /> b. Earthwork related services will include the following: <br /> i. Preform laboratory moisture-density relationship, grain size analysis and Atterberg limits on proposed <br /> fill soils. <br /> ii. Perform density testing on native and fill soils and stone to determine the moisture content and percent <br /> compaction of the soil material. <br /> iii. It is anticipated that earthwork related services will be needed once per week when the Contractor <br /> is working along the roadway shoulder, limited to twenty (20) site visits. <br /> c. Provide subconsultant with OSHA 40-hr HAZWOPER certification to provide the following services: <br /> i. Screen excavated soil with a PID; <br /> ii. Collect soil samples from stockpiles for analysis and/or waste characterization; <br /> iii. Collect water samples from groundwater in utility trenches for analysis; and <br /> iv. Provide a summary report of field observations, analytical results, and recommendations for soil and/or <br /> groundwater management. <br /> 5. Post-Construction Phase <br /> The Consultant, following the completion of construction of the project will: <br /> 1. Compile project inspector logs, site inspection notes, construction photographs and, if not <br /> already provided, a complete reporting of all construction material testing and submit a digital <br /> record of same to the County. <br /> 2. Compile all operator's manuals and material information for the project and submit to the <br /> County in hardcopy and digital format. <br /> 3. Provide a final accounting of all quantities installed versus bid, including change orders and <br /> related costs. <br /> 4. Assist and advise County on release of retainage and the final project reconciliation change <br /> order. <br /> 5. Create and seal a set of record (as-built) drawings of the newly completed sewer extension for <br /> submission to the State, City of Mebane and Orange County's records. <br /> 6. Provide final certification of the sewer construction as required by the various local, State <br /> agencies involved with this project. <br /> 7. Other Engineering Related Activities <br /> The Consultant will perform other engineering related activities, as necessary, during the project <br /> on a per hour basis using agreed upon rates, including but not limited to <br /> • Revise drawings as necessary to reflect specific minor details prior to beginning of construction <br /> or during construction, e.g. minor manhole location shifts and additions, deletion or shifting of <br /> service lateral locations, etc. <br /> • Major re-design work caused by unforeseen field conditions or other factors, e.g. rerouting <br /> entire sewer lines <br /> OWNER'S RESPONSIBILITIES: <br /> The County shall provide or perform the following: <br /> 1. Access to and reproduction of all pertinent records maintained by the County <br /> 2. Direction with regard to fundamental project objectives <br /> 3. General review of all materials submitted <br /> 4. Designate an owner's representative to interface with citizens and press and deal with public <br /> relation issues <br /> 5. Provide timely responses to questions from consultant <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.