Orange County NC Website
24 <br /> 1. Perform a constructability and technical review of the previously prepared construction <br /> documents to establish the integrity of the documents and acceptance of the former <br /> engineering design. <br /> 2. Completion of construction documents (plans & specifications) previously prepared to <br /> approximately the 95% level. Consultant will have the option of utilizing their own standard <br /> technical specifications for construction. <br /> 3. 100% edit of Orange County's template construction contract and integration with bid <br /> documents to be included in the project/contract manual. <br /> 4. Complete redesign of the pump station site plan, submittal to Orange County Current Planning <br /> and related site plan review processing to secure a zoning compliance permit. <br /> 5. Permitting updates, as necessary to accommodate plan revisions. All but the erosion & <br /> sedimentation control approval had been previously acquired. <br /> 6. Obtain DEQ verification of approval for erosion & sedimentation control (review comments <br /> never returned — auto-approved?). This may be best accomplished through reapplication. <br /> 7. Easement plat modifications, as necessitated by property owner negotiations. At least one <br /> property is affected. <br /> 8. Legal plat modifications for creation of pump station lot. (Former plat competed to 95% and <br /> has been reviewed by Orange County Current Planning twice — minor corrections to complete.) <br /> 9. Bidding and Award services <br /> 10.Construction engineering & inspections (CEI/CMT). Construction materials testing (CMT) and <br /> related inspections may be provided by a subconsultant; however, management by the prime <br /> consultant is a requirement, including day-to-day scheduling during construction, as needed. <br /> 11.Record drawing preparation. <br /> 12.State system certifications. <br /> 13.Perform a constructability and technical review of the previously prepared construction <br /> documents to establish the integrity of the documents and acceptance of the former <br /> engineering design. <br /> 14.In addition to the above duties, Consultant will attend public meetings, Board of County <br /> Commissioners meetings, public hearings and information sessions as may be necessary <br /> during the course of the project. <br /> Detailed Scope Outline: <br /> 1. Bidding and Construction Documents <br /> a. Obtain from the Owner copies of all design drawings; calculations; specifications; and permits <br /> as available. <br /> b. Utilizing the above information, review the existing design for compliance with North Carolina <br /> Department of Environmental Quality (NCDEQ) minimum design criteria, City of Mebane <br /> design standards, and Orange County design standards. <br /> c. Review the provided drawings prepared by former design consultant, dated August 27, 2015, <br /> for compliance with City of Mebane and Orange County's previous design review comments. <br /> Where comments have not been addressed, make revisions to the drawings as required. <br /> d. Submit revised plans, where necessary, for jurisdictional review and approval. Make <br /> corresponding revisions in response to comments, if any. <br /> e. Prepare contract specifications utilizing information provided by the Owner and Consultant's <br /> standard specifications. <br /> f. Prepare an updated Engineer's estimate of probable construction costs, following approval of <br /> revised plans by the Owner and City of Mebane. <br /> g. Complete revisions to the pump station subdivision plat and the easement plat for the M.M. <br /> Fowler property on Mt Willing Road, as necessary. <br /> h. Prepare contract documents in one of the two following formats: <br /> 2 <br />