Browse
Search
Agenda - 06-20-2017 - 8-h - Efland Sewer to Mebane, Phase 2 Extension – Construction Engineering and Inspection Services Contract for the Efland-Buckhorn-Mebane Utility Planning Area
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 06-20-2017 - Regular Mtg.
>
Agenda - 06-20-2017 - 8-h - Efland Sewer to Mebane, Phase 2 Extension – Construction Engineering and Inspection Services Contract for the Efland-Buckhorn-Mebane Utility Planning Area
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2017 4:33:33 PM
Creation date
6/16/2017 3:53:47 PM
Metadata
Fields
Template:
BOCC
Date
6/20/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8h
Document Relationships
Minutes 06-20-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attaclment 4 <br /> ORANGE COUNTY FINANCIAL SERVICES <br /> 200 South Cameron Street, Post Office Box 8181 • Hillsborough, NC • 27278 <br /> Phone: 919-245-2651 • Fax: 919-644-3324 <br /> Request for Qualifications (RFQ), Professional Engineering Services - <br /> Efland Sewer to Mebane, Phase 2 Extension — Design, Bid and Construction Phase Services <br /> RFQ NO. 367-5222 PROPOSALS DUE 5:00 PM EST, Thursday August 11, 2016 <br /> Section I - Introduction <br /> Ladies and Gentlemen: <br /> Orange County is seeking proposals from qualified consultants to provide professional services for <br /> the above referenced project. A selection panel will review and evaluate proposals and submit a <br /> recommendation for a consulting firm for this project to the Orange County Manager. The County <br /> reserves the right to select more than one consultant and/or to divide the scope of services into <br /> design/bid phase and construction phase services. <br /> As part of your statement of qualifications (SOQ), Orange County expects an expression of interest in <br /> and an understanding of the scope outlined herein. It is not necessary to repeat the scope, just <br /> reference the RFQ number. <br /> PROJECT DESCRIPTION: <br /> PROJECT: Efland Sewer to Mebane, Phase 2 Extension <br /> ESTIMATED CONSTRUCTION COST: $3,961,000 <br /> SCOPE OF SERVICES <br /> The project generally consists of the construction of the following elements: <br /> • Approximately 8,300 linear feet of gravity sewer (8" & 12"), including a bore & jack under I- <br /> 40/85. <br /> • Approximately 19,000 linear feet of sewer force main (10" & 12"). <br /> • A submersible sewer pump station (700 gpm) along West Ten Road. <br /> The remaining effort on the subject project falls short of full services, as plans, technical <br /> specifications, easement documents and the legal plat for the West Ten Pump Station have been <br /> completed to approximately the 95% level (engineering firm went out of business). For all intents and <br /> purposes, there are no useable CAD electronics available. PDF's are available and the firms may <br /> explain how they can be used in present form with edits and clarifications as necessary. Easements <br /> have been acquired for all but four (4) properties. The legal plat creating the pump station lot has yet <br /> to be finalized and recorded. Orange County will be responsible for all property owner liaison <br /> responsibilities. <br /> General Scope: <br />
The URL can be used to link to this page
Your browser does not support the video tag.