2
<br /> Attachment 1
<br /> PREPARED BY: Karol P. Mack,Associate General Counsel, Duke Energy Corporation
<br /> Mail To: Duke Energy Carolinas, LLC Site: 001249
<br /> Data&Document Management Land Unit: 1695239
<br /> 550 S. Tryon St., DEC22A Project No: 001249-45867
<br /> Charlotte,NC 28202
<br /> STATE OF NORTH CAROLINA
<br /> EASEMENT
<br /> COUNTY OF ORANGE
<br /> THIS EASEMENT is granted this day of , 20 , by ORANGE COUNTY,
<br /> NORTH CAROLINA, having a mailing address of Post Office Box 818 Hillsboro, North Carolina 27278
<br /> ("Grantor"), and DUKE ENERGY CAROLINAS, LLC, a North Carolina limited liability company, having a
<br /> mailing address of Data& Document Management, 550 S. Tryon St. DEC22A, Charlotte,North Carolina 28202
<br /> ("DEC");
<br /> WITNESSETH:
<br /> That Grantor, in consideration of Ten Dollars ($10.00) and other valuable considerations paid by DEC,
<br /> the receipt and legal sufficiency of which is hereby acknowledged, does grant and convey unto DEC, its
<br /> successors and assigns, the perpetual easements and rights of way set forth herein, for the purposes and subject
<br /> to the terms and conditions set forth herein, over and across the land of Grantor (the "Premises") lying in the
<br /> State and County aforesaid and being more particularly described in the instrument recorded in Book 4247,
<br /> Page 413, Orange County Registry.
<br /> As used herein, the term "Right of Way Strip" shall mean those areas or parcels of land containing 0.46
<br /> ± acres, all as shown on a plat of survey entitled "ROW Easement Exhibit Duke Energy Carolinas LLC," dated
<br /> May 8, 2017, marked Map: 001249-458267, said plat being attached hereto as Exhibit A and incorporated
<br /> herein by reference.
<br /> The easement and right of way herein granted by Grantor to DEC, its successors and assigns, over the
<br /> Premises is subject to the following terms and conditions:
<br /> (a) DEC's Use of Right of Way Strip. Grantor grants to DEC, its successors and assigns, a perpetual
<br /> easement to enter upon the Premises within the Right of Way Strip (as defined herein) to
<br /> construct, reconstruct, replace, rebuild, enlarge, modify, remove, inspect, repair, maintain,
<br /> operate, and use within the Right of Way Strip multiple lines for transporting electrical energy
<br /> Orange County 5.23.17 1
<br />
|