Orange County NC Website
DocuSign Envelope ID:CB634F0D-137B-4976-B1F1-F4E7CF18C9CE <br /> River Park Phase 2 Improvements <br /> Timing: Begin planning right away. Construction of bus stop is to begin in April 2017. Ideally, phase 2 <br /> construction would begin during winter 2017-18 and must be concluded by Labor Day, 2018. <br /> Planned Phase 2 Elements: <br /> Covered Stageā€”to be located near the south end of the lawn nearest Churton St. (in 100 year <br /> floodplain),outside of Geothermals, accessible. Design is to be consistent with nearby architectural <br /> elements. Size and details tbd. <br /> Consider alternate stage location se of stairs from lot nearest Sheriff's. If feasible, both stages could be <br /> included. <br /> paved walkways from nw corner of park,along tree line to meet MST at Eno River, as well as from <br /> nw corner running east to steps near Sheriffs lot. <br /> New park entrance in nw corner near bus stop(*current Town of Hillsborough project) Drainage <br /> improvements may also be needed. <br /> Entrance and walkways to be ADA compliant if possible <br /> Entrance and walkways to be lighted,stage to be lighted and power included for private sound systems, <br /> etc. <br /> 'Existing Chapel Hill gravel walkways to be paved, and connected to new(replacement) bridge currently <br /> in planning stage j 66 <br /> _ 10,t' <br /> Pavilion parking area to be paved and striped Cc f <br /> Consider renovation/replacement of culvert if needed. Truck with trailer access required. <br /> Managing surveys,testing and permits as needed. <br /> Total Budget: +1-$400,000 <br /> *Stephanie Trueblood has the DOT plans for the bus stop on Transportation Grids. She does not have <br /> elevations. She will share what she has. <br />