Orange County NC Website
DocuSign Envelope ID:CB634F0D-137B-4976-B1 F1-F4E7CF18C9CE <br /> /z y <br /> Cr�i <br /> RIVER PARK IMPROVEMENTS <br /> PHASE 2-ORANGE COUNTY <br /> Basic Services = $ 32,000.00 <br /> Approval Process/ <br /> Town of Hillsborough = $ 8,000.00 <br /> Total Design Fee $ 40,000,00 <br /> Surveying,Testing, etc. = $ 10,000.00 <br /> Total Soft Costs $ 50,000.00 <br /> Construction Costs Including <br /> Contingency $350,000.00 <br /> Project Cost $400,000.00 <br /> Construction Cost Breakdown: <br /> Stage = $ 300,000,00 <br /> Sidewalk Improvements = $ 25,000,00 <br /> $ 325,000.00 <br /> Contingency = $ 25,000,00 <br /> Total $ 350,000.00 <br /> cra 222 cloister cowl chapel hill, nc 27514 I t: 919.401.8586 <br />