Browse
Search
Agenda - 03-15-2006-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 03-15-2006
>
Agenda - 03-15-2006-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2017 2:07:58 PM
Creation date
8/29/2008 9:14:37 AM
Metadata
Fields
Template:
BOCC
Date
3/15/2006
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 20060315
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
receive input fiom the SWAB, the Town's, the public, and the BOCC, and <br />prepare a recommended revised Plan and have that revised Plan considered and <br />adopted by the three Towns and the BOCC before the next 3-Year Update to the <br />State required plan is due on June 30, 2006. <br />Suggested Timeline <br />2004 <br />November- December -Solid Waste staff to examine and identify a scope of work and <br />timeline necessary to reexamine and analyze future waste reduction policy (including <br />recyclables collection and processing options). <br />Staff begins information gathering and analysis and discussions with the SWAB that will <br />continue throughout the process. <br />11R <br />February — Staff presents to the BOCC a proposed process and timeline to conduct a <br />study reconsidering the County's long -tern waste reduction strategy, including specific <br />issues previously raised by the Towns of Chapel Hill and Carrboro. Staff receives <br />guidance and proceeds to implement approved process /timeline, <br />March — Staff discusses approved process with SWAB and defines and discusses the <br />SWAB's role in the process. (SWAB will discuss as necessary at any scheduled monthly <br />meeting or at a special meeting if desired). A letter- will be sent to the four jurisdictions <br />requesting appointments to the Work Group. <br />March /April - Work Group is fornned and meets to receive progress update and review <br />work to date, discuss their role and degree of involvement in the process, and to provide <br />guidance /input to the process. <br />April — Staff provides status of process to the Assembly of Govermments, including <br />discussion of Interlocal Agreement provisions regarding long terns planning policies. <br />August/September — Work Group meets as necessary. <br />September - SWAB provides status update to BOCC and Town Boards (if desired). <br />Public education conducted on the newly proposed Plan elements. <br />October — SWAB sponsors open forum for citizen input. <br />November /December — Staff submits preliminary draft of recommended revised Plan to <br />Work Group and SWAB. Receives feedback on recommendations. <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.