Browse
Search
2017-208-E SW - SCS Engineers, PC for Engineering and Environmental Services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-208-E SW - SCS Engineers, PC for Engineering and Environmental Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 9:43:28 AM
Creation date
6/9/2017 10:43:15 AM
Metadata
Fields
Template:
Contract
Date
5/22/2017
Contract Starting Date
5/22/2017
Contract Ending Date
4/21/2022
Contract Document Type
Agreement - Services
Agenda Item
2/21/17
Document Relationships
R 2017-208-E SW - SCS Engineers, PC for Engineering and Environmental Services
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:7ACADO9D-B318-4AD6-B8E5-CB7B9C2A289F <br /> SCS ENGINEERS <br /> acres in the City of Manassas. The composting area is <br /> approximately 20 acres. SCS recently amended the Virginia <br /> Department of Environmental Quality Permit By Rule to accept <br /> and compost food waste. <br /> New Household Hazardous Waste/Electronic Waste Facility <br /> Conceptual Site Design. SCS prepared a conceptual design for a <br /> household hazardous waste and electronics acceptance, <br /> processing and storage area. The prior HHW and electronics area <br /> was not sufficient to accommodate the volume of HHW and <br /> electronics collected. In addition, some residential vehicles <br /> cannot easily negotiate the turnaround area without backing up <br /> and the facility does not currently have loading docks for ease of <br /> material transfer. Tasks included: <br /> • Design basis memorandum <br /> • Development of conceptual design plans <br /> • Projection of HHW/E-waste quantities <br /> Project Profile <br />
The URL can be used to link to this page
Your browser does not support the video tag.