Orange County NC Website
DocuSign Envelope ID:7ACADO9D-B318-4AD6-B8E5-CB7B9C2A289F <br /> SCS ENGINEERS <br /> Landfill Gas Management and Landfill Engineering <br /> Shoosmith Sanitary Landfill <br /> Chesterfield County, Virginia <br /> Client Shoosmith Sanitary Landfill is a privately owned solid waste <br /> management facility consisting of a waste management unit <br /> Shoosmith Bros.,Inc. boundary of 374 acres. The permitted waste disposal area is <br /> 217 acres and the Phase I area involves a vertical and lateral <br /> Contact expansion. The landfill is subject to NSPS, Title V, and MACT <br /> Bruce Coble for MSW landfills and a landfill gas (LFG) collection and <br /> Manager of Landfill Operations control system has been in operation since 1988. <br /> 804.748.5823 <br /> Engineering Design, Permitting, and Review. Initially SCS <br /> Contract Amount was retained by Chesterfield County to provide an independent, <br /> third party review of Part A and Part B permit application <br /> > $1,000,000 documents (prepared by others) for expansion of the sanitary <br /> Highlights landfill. The expansion area included an existing granite quarry <br /> (during the first phase continues operating simultaneously with <br /> ✓ Landfill Design landfilling activities). Once mining activities cease, the quarry <br /> ✓ Design Documents Third-Party will be lined then filled with refuse during the second phase. <br /> Review <br /> ✓Solid Waste Permit Amendments SCS reviewed documents for compliance with the Conditional <br /> ✓Air Permit Documents Use Permit as well as County and Virginia Solid Waste <br /> ✓ LFG Collection System Management Regulations, provided written technical <br /> Modifications <br /> ✓ Polluant Emission Inventories comments, and coordinated with VDEQ reviewers, design <br /> ✓ NSPS,Title V, NSR,MACT engineer and the Facility. SCS reviewed geologic and <br /> Compliance hydrogeological information, quarry blasting plans, odor <br /> ✓Solid Waste Mgmt. Plan Review <br /> ✓control Device Performance Tests management plan, and attended several public hearings <br /> ✓Construction Engineering Services assembled before the County Board of Supervisors to answer <br /> ✓Odor Monitoring questions regarding the expansion. The Facility was issued an <br /> ✓ LFG Sampling and Analysis amended Solid Waste Permit in 1999. <br /> ✓Traffic Impact Study <br /> ✓ Noise Management Plan Solid Waste Permit Amendment. SCS was later retained by <br /> Shoosmith Bros. to amend the Solid Waste Permit in order to <br /> reconfigure the waste disposal limits, make improvements to <br /> the landfill design, and facilitate a sequence of construction for <br /> developing and operating the landfill that will improve <br /> coordination with the current and future quarry operations. This <br /> work included preparation of Part A and Part B application <br /> ''F' 1,r`a /// documents for a major amendment addressing reconfiguration <br /> ,� ry ") ) ;,* A��, of cell limits, base grades, final grades, alternate liner <br /> w-,, '07 ,� configuration, leachate management system modifications, <br /> :� � �� changes to the groundwater monitoring network, and related <br /> 1�� ,`�'t �, �� ��� � � redesign efforts. This project also involved wetlands?„,.,,,5 <br /> a , ,N :'10,,,,,11 considerations, airspace calculations and life expectancy, and <br /> , , ": , ,, , ' ," , incorporation of technological advances for solid waste <br /> management facility construction, operation, and monitoring, <br /> such as updates to the geosynthetic material specifications. SCS <br /> Project Profile <br />