Orange County NC Website
DocuSign Envelope ID:7ACADO9D-B318-4AD6-B8E5-CB7B9C2A289F <br /> Union County Solid Waste Management SCS ENGINEERS <br /> II 0 �o documentation for the County's landfill fifteen (15) <br /> groundwater monitoring wells and two (3) surface water <br /> ° r sampling locations for the 15A NCAC Subchapter 2L <br /> � o Appendix I and II water quality constituents. <br /> 111111 1111111111h11111 1101,1114),//40 Slim,1 I'm III �` 4 i Landfill Groundwater Contamination Remediation. SCS <br /> 1,„,r,li r �'��a , %»y` ,�� provided field testing and designed a remedial strategy for <br /> 1,00(iitl„)v V 11,/16,,,,,,,, ,,,,impoo„„,,,I,,,,1„,,II removing contaminates from the landfill property s <br /> groundwater. The remedial strategy included a combination of <br /> 1dt r'; . <br /> EmIllIMMIN NO! monitored natural attenuation (MNA) and phyto-remediation.; 4.04'," ./SOMIOW 1011110111101010 <br /> The phyto-remediation system, utilizing beds of hybrid poplar <br /> trees installed in the downgradient region of the groundwater <br /> monitoring wells in which 2L exceedances have occurred to <br /> restore groundwater quality in these regions. In areas of the <br /> landfill which are unsuitable to install phyto-remediation beds <br /> due to groundwater depths and/or steep topography, a <br /> groundwater extraction system is installed and the extracted <br /> groundwater applied to a phyto-remediation area through drip <br /> irrigation. Additionally natural attenuation is also used to <br /> degrade certain constituents of concern which have exceeded <br /> the 15A NCAC 2L groundwater quality standards (2L <br /> groundwater quality standard) within the reducing environment <br /> of the uppermost pervasive aquifer. <br /> Construction and Demolition (C&D) Landfill Closure. SCS <br /> staff prepared a closure design and bidding and construction <br /> drawings and specifications for 13.2 acres of the County's <br /> C&D Landfill that is located on-top of a non-Subtitle D MSW <br /> Landfill. In addition, bidding and construction administration <br /> support services were <br /> provided to the County during <br /> ,� ,� �„ � bidding, contractor <br /> aid i o ' procurement and construction. <br /> el,0111141'� Y ,/% SCS staff provided <br /> construction quality assurance ' .� ii i%/ il <br /> (CQA) services during landfill f y <br /> closure construction. Upon 1 <br /> �i rigor <br /> completion of the landfill ���r il/ %,, �� ' <br /> l /ire ,, /r , i °y i r' <br /> closure construction, a CQA ) l�,/� �p�/��������� ° ' <br /> Certification Report was , !e` r <br /> prepared and submitted to <br /> NCDENR and subsequently approved. <br /> Project Profile <br />