DocuSign Envelope ID:7ACADO9D-B318-4AD6-B8E5-CB7B9C2A289F
<br /> SCS ENGINEERS
<br /> LFG Permitting , Design , Construction, and Utilization
<br /> South Wake Landfill and Feltonsville Landfill
<br /> Holly Springs and Apex, North Carolina
<br /> Client Reference SCS has been retained by Wake County's Facilities Design and
<br /> John Roberson, PE Construction Department to perform landfill gas-to-energy
<br /> Wake County Facilities Design & (LFGE) feasibility evaluations, and greenhouse gas emission
<br /> Construction Department reduction (carbon credit) studies for the South Wake and/or
<br /> 919.856.6365
<br /> Feltonsville landfills. Also, SCS performed field
<br /> Contract Amount: >$200,000 investigations, developed LFG control system design, and
<br /> Date: 2008 to present assisted the County with permitting, bidding, CQA, and
<br /> construction administration.
<br /> Key Personnel
<br /> Bob Dick, PE, Project Director Landfill Gas Collection and Control System. SCS designed and
<br /> John Hurford, PE, Project Advisor permitted the first phase of an active landfill Gas Collection
<br /> Patrick LeClair, Project Engineer and Control System (GCCS). The County elected to install the
<br /> Nick Guarriello, Staff Engineer GCCS, prior to any regulatory requirement, to both monetize
<br /> Highlights the carbon credits and support a beneficial energy use project.
<br /> Specific activities involved:
<br /> ✓ LFG System Design
<br /> ✓ Construction Documents • Performed the engineering design to develop construction
<br /> ✓ Bid Assistance
<br /> ✓ Construction Engineering drawings and specifications, developed construction cost
<br /> ✓ Permitting estimates, provided bid assistance services, and construction
<br /> ✓ LFGE Feasibility Study administration such as shop drawing review.
<br /> ✓ Pipeline Route Study
<br /> ✓ LFGE Pipeline Design • Developed permit documentation for wastewater industrial
<br /> ✓ LFGE Pipeline Permitting
<br /> discharge permit, solid waste permits, and erosion and
<br /> sedimentation control plan and interfaced with NCDENR
<br /> "1 and Town of Holly Springs.
<br /> N
<br /> LFG Transmission Pipeline to Novartis. SCS designed and
<br /> ),Iii4PA,4,1) 4 permitted a LFGE transmission pipeline from the South Wake
<br /> II1M" \\`\'\'\\
<br /> Landfill to. the Novartis Pharmaceutical Plant in the Town of
<br /> ,Of p'41,iiiiiiiilljl ,); /
<br /> l z Holly Springs. Specific activities involved:
<br /> j//,,;//' (, i"r 1 • Prepared a report comparing the advantages and
<br /> ///// %� / �r/,/O ,%�bo�//// z h„
<br /> 1�rJ%(�� / �l� , � � , f disadvantages of three pipe routes for carrying processed
<br /> ���� ��j „��,„ � � LFG to the Novartis Pharmaceutical Plant 3 miles southwest
<br /> ''^� d
<br /> f � t� „a,■� ,�,, of the landfill.
<br /> flirAfp;,la ,',/,; ,��A40 • Coordinated on survey of final route and developed design
<br /> ,, °; / 0, //)�'"////7,1 (0/� criteria for proposed pipeline. Performed the engineering
<br /> design to develop permit-level drawings and specifications
<br /> for Encroachment Agreement and interfaced with NCDOT,
<br /> NCUC, and other agencies.
<br /> Project Profile
<br />
|