<br /> SCS ENGINEERS
<br /> Landfill Gas Control, Compliance, and Permitting
<br /> North Wake Landfill
<br /> Raleigh, North Carolina
<br /> Client Reference SCS has been retained by Wake County's Solid Waste
<br /> John Roberson, PE, Director Management Division and by the County's Facilities Design
<br /> Lee Squires, PE, Facilities Manager and Construction Department to perform landfill gas (LFG)
<br /> Johnny Beal,Facilities Manager evaluations, regulatory compliance and permitting, LFG control
<br /> Wake County Solid Waste
<br /> Management Division system design, CQA, testing, control system operations and
<br /> 919.856.6365 repairs, monitoring, landfill gas-to-energy (LFGE) project
<br /> 919.518.0274 technical support, and greenhouse gas emission reduction
<br /> John Roberson, PE (carbon credit) studies for the Feltonsville, North Wake, East
<br /> Wake County Facilities Design & Wake, and/or South Wake landfills. Task assignments specific
<br /> Construction Department to North Wake Landfill are described below.
<br /> 919.856.6365
<br /> Clean Air Act (CAA) Permitting & Compliance. SCS has
<br /> Contract Amount: >$900,000 assisted the County and provided interface with NCDENR
<br /> Date: 1999 to present regarding compliance with the New Source Performance
<br /> Standards (NSPS), Title V Air Operating Permit, and National
<br /> Key Personnel Emission Standards for Hazardous Air Pollutants (NESHAP)
<br /> Bob Dick, PE, Project Director requirements applicable to the North Wake and South Wake
<br /> Jim Michelsen,Technical Advisor
<br /> Brandon King, Project Scientist Landfills. Specific activities have included development of the
<br /> Nick Guarriello,Staff Engineer NSPS Design Plan, annual emissions inventory for regulated
<br /> criteria and toxic air pollutants, Semi-annual NSPS/Title
<br /> Highlights V/SSM Plan reports, conduct routine surface emissions
<br /> ✓ LFGE Economic Analysis monitoring, consulting during NCDENR air inspections,
<br /> ✓ Coordination w/ LFGE preparation of the Startup, Shutdown, and Malfunction (SSM)
<br /> Developer Plan for the LFG system in accordance with the MACT Rule.
<br /> ✓ GHG Pump Test
<br /> ✓ LFG Recovery Projections
<br /> ✓ LFG Migration Control LFG Migration Control and Remediation. SCS provided
<br /> ✓ Air Permitting services pertaining to LFG migration control and remediation at
<br /> ✓ Regulatory Compliance and the North Wake Landfill (as well as at the South Wake and
<br /> Interface Feltonsville Landfills). Responsible for preparation of solid
<br /> • LFG Remediation Plan waste permit amendment documents, regulatory compliance
<br /> V Monitoring and Reporting
<br /> ✓ Emissions Inventory and negotiations with NCDENR pertaining to landfill post-
<br /> ✓ Sampling and Evaluations closure programs related to environmental monitoring and
<br /> , y remediation. Specific activities have included development of
<br /> LFG Remediation Plans, LFG System operational efficiency
<br /> 11111, moari 14) 4111[11111,1,
<br /> 1 i Iy ,
<br /> � ��„�y�� i 1� , � evaluation, LFG monitoring probe installation and, ; �`, , decommissioning, communications with NCDENR regarding
<br /> NI I [, III '1111111111 li+04 OLIP#PIIIMPA monitoring data and remediation approach, conduct routine
<br /> ” monitoring and reporting for the LFG perimeter probe network.
<br /> 111 �Yi, 1 1" CQA and Construction
<br /> Engineering. SCS p erformed CQA
<br /> i
<br /> 11411 services of LFG monitoring probe installation and LFG control
<br /> system construction, including numerous network
<br /> modifications and LFG system expansions.