Browse
Search
2017-208-E SW - SCS Engineers, PC for Engineering and Environmental Services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-208-E SW - SCS Engineers, PC for Engineering and Environmental Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 9:43:28 AM
Creation date
6/9/2017 10:43:15 AM
Metadata
Fields
Template:
Contract
Date
5/22/2017
Contract Starting Date
5/22/2017
Contract Ending Date
4/21/2022
Contract Document Type
Agreement - Services
Agenda Item
2/21/17
Document Relationships
R 2017-208-E SW - SCS Engineers, PC for Engineering and Environmental Services
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:7ACADO9D-B318-4AD6-B8E5-CB7B9C2A289F <br /> Orange County, NC RFQ 5225 SCS ENGINEERS <br /> 000000000000000000 '1000000000000 00100000000000 <br /> III- :men <br /> 1111111111111111111111111111 ii.0000001 ;°1;00000000000 1111111111111111111111111 <br /> 111111111111111111111111111111111111111 111111111111111111111111111 01111111111111111111111111111 li-10000000000001 .11111111111111111111111111111 1.1111111111111111111111 <br /> 111111111111111111111111111111111111111 III'" 1100', 11111111110111111111111111111 <br /> 000000000000000010 <br /> nu <br /> I <br /> 1,1 00.0 000000 y <br /> uo- m <br /> 111111111 11111111111111111 v <br /> 11100* ill nummum 111 1111111111111111111111111 Qum summun 5 111011 1111111111111111111111111111 1N 111111111111111111000 <br /> p;,lu <br /> lom. <br /> 011111111111111111 1111111111111111111111111111 It 1;10000000000000 IIIIIIIII VIII rI <br /> 06.X11 I uommool <br /> udl I IIIIIIIII Illlll II <br /> King County,WA 1' ✓ <br /> Richland,WA ✓ ✓ ✓ ✓ <br /> Yakima County,WA ✓ ✓ ✓ <br /> Benning Road,Washington, DC ✓ ✓ ✓ ✓ ✓ ✓ <br /> Fort Totten,Washington, DC ✓ ✓ ✓ ✓ ✓ ✓ <br /> SCS has designed and implemented numerous solid waste facilities including transfer stations, <br /> material recovery facilities, and vehicle and maintenance facilities. SCS maintains full <br /> architectural and engineering capabilities that have been developed specifically for the planning, <br /> design, and construction administration of various types of solid waste facilities. <br /> Transfer stations and material recovery facilities (MRFs) designed by SCS range in size from 50 <br /> to over 5,000-tons per day and operate in a wide range of conditions. We have designed transfer <br /> stations and MRFs for the public sector and the private sector. While providing engineering <br /> solutions for these projects, SCS routinely addresses economic concerns, operational challenges <br /> and permitting/regulatory issues. <br /> Solid Waste Landfills <br /> With specific regard to solid waste management facilities, SCS provides a full range of <br /> engineering,permitting and design services for both small and large facilities,public or private <br /> owners, new cells, lateral or horizontal expansions, as well as closure design and post-closure <br /> engineering, end-use planning and construction engineering/quality assurance. <br /> Over the years, SCS has developed standardized specifications for our landfill design, LFG and <br /> construction projects. We have developed time-tested specification sections covering <br /> geomembrane liners, geosynthetic clay liners, geocomposite drainage nets, low permeability soil <br /> liners, leachate collection systems and other technical specification that are unique to SCS for <br /> our landfill projects. These technical specifications formed the basis for many landfills in the <br /> area, and are available to SCS staff via our intranet database. Also, these specifications are <br /> written in the Construction Specifications Institute (CSI) format for ease of use and uniformity. <br /> We also hold licenses for EJCDJ"front-end" documents that have become industry standards. <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.