Browse
Search
2017-208-E SW - SCS Engineers, PC for Engineering and Environmental Services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-208-E SW - SCS Engineers, PC for Engineering and Environmental Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 9:43:28 AM
Creation date
6/9/2017 10:43:15 AM
Metadata
Fields
Template:
Contract
Date
5/22/2017
Contract Starting Date
5/22/2017
Contract Ending Date
4/21/2022
Contract Document Type
Agreement - Services
Agenda Item
2/21/17
Document Relationships
R 2017-208-E SW - SCS Engineers, PC for Engineering and Environmental Services
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:7ACADO9D-B318-4AD6-B8E5-CB7B9C2A289F <br /> Orange County, NC RFQ 5225 SCS GINEER <br /> the Landfill site is the Eubanks Solid Waste and Recycling Center, a residential drop-off material <br /> collection center, and the Solid Waste Management Department Administration Building. <br /> Orange County maintains one of the highest waste reduction rates in the state, with 64 percent <br /> waste reduction as compared to the 1997 baseline. The County currently transports the solid <br /> waste from the collection centers to a transfer station owned by the City of Durham. SCS <br /> understands that the County is currently exploring the potential to construct and operate a local <br /> transfer station and other alternatives to the current approach for solid waste management and <br /> disposal. <br /> RESPONSE TO COUNTY'S REQUESTED INFORMATION <br /> Exhibit 1 below describes how SCS' Statement of Qualifications complies with the <br /> information requested in the RFQ: <br /> Exhibit 1 : Information Requested in RFQ <br /> General information of the firm, available <br /> 1 resources, subcontractors and range of Refer to Section 2 <br /> services. <br /> Experience of the firm with similar "as Refer to Section 2 as well as the <br /> 2 needed" engineering contracts. Include <br /> references. Project Profiles in Appendix A <br /> Listing of any past or ongoing litigation as <br /> the result of errors or omissions by the firm or Refer to Section 4 as well as the memo <br /> 3 key personnel over the last 5 years. Please <br /> provide a description of the incident that in Appendix B <br /> caused the litigation and the outcome. <br /> Qualifications of the proposed Project <br /> 4 Manager(s) and other key personnel that Refer to Section 3 <br /> would most likely be assigned. <br /> Geographic location of the firm (or office <br /> 5 carrying out the work) relative to Orange Refer to Section 2 <br /> County. <br /> 6 Copy of current rate sheet. Refer to Section 5 as well as the Fee <br /> Schedule in Appendix C <br /> 7 Proof of professional liability insurance Refer to Section 6 and Appendix D <br /> Living Wage requirements, E-Verify <br /> 8 requirements, and Iran Divestment Act Refer to Section 7 and Appendix E <br /> Requirements <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.