Orange County NC Website
9 <br /> systematically reduce the backlog of deferred maintenance that has accumulated; and alter <br /> existing facilities to respond to changing educational requirements." <br /> Current Replacement Value x Gross Sq Ft x 4% <br /> Recommended annual amount to make sure buildings are "clean and in good working order", <br /> including grounds, cleaning, minor repairs, and utilities. <br /> Current Replacement Value x Gross Sq Ft x 3% <br /> National Institute of Building Sciences <br /> 2016 State of Our Schools: K-12 Facilities <br /> Funding to Properly Maintain School Facilities <br /> Recommended annual amount to "regularly upgrade existing facilities' systems, components, <br /> fixtures, equipment and finishes..." <br /> CRV ($192) x Gross Sq Ft (1.4M) x 4% = $10,718,408 for OCS <br /> CRV ($192) x Gross Sq Ft (2.1 M) x 4% = $16,379,112 for CHCCS <br /> Recommended annual amount to make sure buildings are "clean and in good working order.." <br /> CRV ($192) x Gross Sq Ft (1.4M) x 3% = $8,038,806 for OCS <br /> CRV ($192) x Gross Sq Ft (2.1M) x 3% = $12,284,334 for CHCCS <br /> Total Recommended Expenditure Amount: 7% - $47.2 million annually <br /> 6% - $40.3 million annually <br /> 5% - $33.6 million annually <br /> 2016-17 OCS & CHCCS Total Expenditures: 3.7% - $24.7 million annually <br /> Commissioner McKee referred to the unfunded plan on page 8, and asked if these <br /> projected cost estimates are outside of anything that the bond may cover. <br /> Todd LoFrese said yes. <br /> Commissioner McKee referred to page 9, and the SAPFO projections. He sais CHCCS <br /> are projecting such a low increase in the number of new students, that new schools will not be <br /> needed for 10 years, and this is opposite of what the BOCC was told in the transit plan. <br /> Todd LoFrese said CHCCS is operating at about 98% capacity, and the SAPFO <br /> numbers do not trigger until they hit certain levels. He said over the past few years there has <br /> been a flatness of student growth, but next year CHCCS is expected to grow by 222 students. <br /> Commissioner McKee said the schools' projections are probably more correct. <br /> Andrew Davidson said it is not just the slow enrollment growth, but the fact that there <br /> will be an increase in capacity through some of the construction done with bond funds. <br /> Commissioner McKee referred to the fund balance allocation on page 7, and asked if <br /> the schools are thinking about using excess fund balance on capital projects. <br /> Todd LoFrese said the existing joint policy states that the BOE shall develop a plan for <br /> the use of fund balance that is in excess of 5.5% target. He said as part of that policy, it <br /> recommends that fund balance should be used for one-time expenditures, not recurring budget <br /> needs. He said CHCCS has increasing constructions costs, and is concerned about the <br /> project budgets at Lincoln Center and Chapel Hill High School. He said there is a strong <br /> likelihood that some of the fund balance will need to be contributed to those projects. <br /> Commissioner McKee said these fund balances were accumulated through funding of <br /> operating expenses, and asked if this excess fund balance has been used before for capital <br /> expenses. <br /> Todd LoFrese said CHCCS have used fund balance before for capital expenses, <br /> including the entire Glenwood Elementary project, at $1.2 million. He said the fund balance <br /> increases in a variety of ways: a budget line is under-expended; close fiscal monitoring; and <br />