Browse
Search
Agenda - 03-02-2006-9d
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 03-02-2006
>
Agenda - 03-02-2006-9d
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:34:24 AM
Creation date
8/29/2008 9:14:03 AM
Metadata
Fields
Template:
BOCC
Date
3/2/2006
Document Type
Agenda
Agenda Item
9d
Document Relationships
Minutes - 20060302
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
° ~~ 3.0 /~ <br />PART II of Permit, Final Limitations and controls For Permitted Discharges <br />BMP Interlocal Year Year Year Year Year <br /> Res onsibili One Two Three Four Five <br />Section E of Part 11: Construction Site Runoff Controls <br />Implement a program Erosion and X X X X X <br />and establish a Sedimentation Control <br />regulatory mechanism Ordinance <br />for erosion and Implementation <br />sediment control <br />Develop requirements Erosion and X X X X X <br />on construction site Sedimentation Control <br />operators Ordinance <br /> Im lementation <br />Provide educational Erosion and X X X X X <br />and training materials Sedimentation Control <br />for construction site Ordinance <br />o erators Im lementation <br />Institute plan reviews Erosion and X X X X X <br /> Sedimentation Control <br /> Ordinance <br /> Im lementation <br />Establish public Erosion and X X X X X <br />information procedures Sedimentation Conhol <br /> Ordinance <br /> lm lementation <br />Establish inspection Frosion and X X X X X <br />and enforcement Sedimentation Control <br />procedures Ordinance <br /> Im lementation <br />PART II of Permit, Final Limitations and controls for Permitted Discharges <br />BMP Interlocal Year Year Year Year Year <br /> Res onsibility One Two Three Four Five <br />Section F of Permit: Post-Construction Site Runoff Controls <br />Establish aPost- County Has X X X <br />Construction Ministerial <br />Stormwater Responsibility <br />Mana ement Pro ram <br />Establish strategies County Has X X X <br />which include BMP's Ministerial <br />appropriate for the Responsibility <br />MS4 <br />Establish a program to County Has X X X <br />control the sources of Ministerial <br />fecal coliform to the Responsibility <br />maximum extent <br />racticable <br />Establish nutrient County Has X X X <br />sensitive water (NSW) Ministerial <br />protection measures Responsibility <br />(for rograms with <br />Page 10 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.