Browse
Search
Agenda - 06-06-2017 - 8-d - Installation of Generators at Six Orange County Facilities
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 06-06-2017 - Regular Mtg.
>
Agenda - 06-06-2017 - 8-d - Installation of Generators at Six Orange County Facilities
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2017 8:08:36 AM
Creation date
6/2/2017 9:46:44 AM
Metadata
Fields
Template:
BOCC
Date
6/6/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8d
Document Relationships
Minutes 06-06-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> and non-appropriation of public funds. It is expressly agreed that Owner shall not activate this <br /> non-appropriation provision for its convenience or to circumvent the requirements of this <br /> Agreement,but only as an emergency fiscal measure during a substantial fiscal crisis. <br /> c. In the event of a change in the Owner's statutory authority, mandate and/or mandated <br /> functions, by state and/or federal legislative or regulatory action, which adversely affects <br /> Owner's authority to continue its obligations under this Agreement, then this Agreement shall <br /> automatically terminate without penalty to Owner upon written notice to Contractor of such <br /> limitation or change in Owner's legal authority. <br /> 7. NOTICES <br /> Any notice required by this Agreement shall be in writing and delivered by certified or registered mail, <br /> return receipt requested to the following: <br /> Owner: Contractor: <br /> Orange County National Power Corporation <br /> Attn: Jeff Thompson Attn: Joel Cheek <br /> P.O. Box 8181 4541 Preslyn Drive <br /> Hillsborough,NC 27278 Raleigh,NC 27616 <br /> 8. MISCELLANEOUS <br /> a. Duties and Obligations imposed by the Contract Documents shall be in addition to any Duties <br /> and Obligations imposed by state, federal or local law,rules,regulations and ordinances. <br /> b. No act or failure to act by the Owner or Contractor shall constitute a waiver of any right or <br /> duty granted them under the Contract Documents, nor shall any act or failure to act constitute <br /> any approval except as specifically agreed in writing. <br /> c. The Work shall be tested and inspected as required by the Contract Documents and as required <br /> by law. Unless prohibited by law the costs of all such tests and inspections related to state and <br /> federal codes such as ADA, Administrative, Electrical, Plumbing, Mechanical and Building <br /> Codes shall be borne by the Contractor. The costs for material and structural testing shall be <br /> conducted by an independent third party at the expense of the Owner. Delays related to any of <br /> the aforementioned tests and inspections shall not be grounds for delaying the completion of <br /> the work. If any such tests and inspections reveal deficiencies in the Work such that the Work <br /> does not comply with terms or requirements of the Contract Documents and/or the <br /> requirements of any code or law the Contractor is solely responsible for the cost of bringing <br /> such deficiencies into compliance with the terms of the Contract Documents and/or any code <br /> or law. <br /> d. Should the Owner reject any portion of the Work for failing to comply with the Contract <br /> Documents Contractor shall immediately, at Contractor's expense, correct the Work. Any <br /> such rejection may be made before or after substantial completion. If applicable, any <br /> additional expense borne by the Owner under this section shall be paid at Contractor's <br /> expense. <br /> e. The Contractor shall not assign any portion of this Agreement nor subcontract the Work in its <br /> entirety without the prior written consent of the Owner. <br /> Revised 2/17 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.