Browse
Search
Agenda - 06-06-2017 - 8-a - Minutes
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 06-06-2017 - Regular Mtg.
>
Agenda - 06-06-2017 - 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2017 8:08:09 AM
Creation date
6/2/2017 9:46:43 AM
Metadata
Fields
Template:
BOCC
Date
6/6/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8a
Document Relationships
Minutes 06-06-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27 <br /> 1 Cliff Brown said yes. He said, on average, a brand new site for a tower is about $1.4 <br /> 2 million, including equipment, prepping the land, etc. He said higher towers cost more money, <br /> 3 but there would be less land costs. <br /> 4 Commissioner Marcoplos said he lives 11 miles outside of Carrboro, and suggested <br /> 5 putting the tall towers in Chapel Hill and Carrboro, as the blinking lights would blend in with the <br /> 6 urban landscape; and put the unblinking lights in the rural areas. He said to use a hybrid <br /> 7 system of towers. <br /> 8 Cliff Brown said guidance from the County is welcomed. He said existing structures are <br /> 9 being considered as well, such as the University of North Carolina (UNC) and a building just <br /> 10 over the Durham County line. He said the 700-800 system, which is the long term solution for <br /> 11 the County, are also VHF sites, which would eliminate duplication. <br /> 12 Commissioner Jacobs said as far as siting taller towers, the County looked at bird <br /> 13 flyways in considering the location of higher towers, which kill birds. He said lower towers were <br /> 14 preferred for this reason, and Craig Benedict may have that information. He said the Audubon <br /> 15 Society may also be helpful. <br /> 16 Chair Dorosin asked if the County will have to pay fees to Durham if it uses a shared <br /> 17 system. <br /> 18 Cliff Brown said yes, and this cost is not factored into the cost estimates reviewed this <br /> 19 evening. He said the costs identified this evening are only capital costs. He said the fees <br /> 20 depend on how many users are in the system, but the initial quotes range from $50,000- <br /> 21 $100,000 annually. <br /> 22 Chair Dorosin asked if VIPER will let them use their towers. <br /> 23 Cliff Brown said it depends on who owns the tower, and some will allow use, and some <br /> 24 will not. <br /> 25 Chair Dorosin asked if the recommendation is to abandon VIPER. <br /> 26 Cliff Brown said yes, and the main reasons are: coverage, capacity, and reliability. <br /> 27 Chair Dorosin said asked if there is an option between the $2 million and the $30 million; <br /> 28 and it seems like that is the $26 million option. <br /> 29 Cliff Brown said this is recommended answer. He said the VHF solution would provide <br /> 30 County coverage, and consists of 10 sites and costs $10 million. He said this would be <br /> 31 conventional analogue, and VHF involves a lot of interference and skip. He said new <br /> 32 frequencies would be needed, which may be difficult due to how long VHF has been in use. He <br /> 33 said there are grants available, and usually require systems to be P25 and have interoperability. <br /> 34 He said these requirements promote counties coming together to create regional systems. <br /> 35 Chair Dorosin asked if there is a lot of grant funding available. <br /> 36 Cliff Brown said there are multiple grants per year, and the amounts vary greatly. <br /> 37 Chair Dorosin asked if other areas are leaving VIPER. <br /> 38 Cliff Brown said some are leaving, and some are joining the system. He said there are <br /> 39 a large variety of radio systems across the State. <br /> 40 Bonnie Hammersley said staff wanted the BOCC to have this report before discussing <br /> 41 capital prioritization next week. She said no action is required this evening. <br /> 42 Chair Dorosin said the proposed plan notes that the first four towers should be in the <br /> 43 southern end of the County. He said there seems to be good coverage in this part of the <br /> 44 County already, and asked if these towers should be put in more rural areas where coverage is <br /> 45 lacking. <br /> 46 Cliff Brown said that plan would move the higher quantity of users into a new system, <br /> 47 where they are not competing for fewer channels on the VIPER system. He said this would <br /> 48 offer the quickest relief to the problems with VIPER, to the largest number of users. He said <br /> 49 P25 is the industry standard and is connected to all funding streams, but VIPER is P25 and so <br />
The URL can be used to link to this page
Your browser does not support the video tag.