Browse
Search
2017-195-E Planning - Hillsborough Plumbing Company Inc. to install RPZ at Brookhollow pump station
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-195-E Planning - Hillsborough Plumbing Company Inc. to install RPZ at Brookhollow pump station
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 9:15:09 AM
Creation date
5/31/2017 2:43:50 PM
Metadata
Fields
Template:
Contract
Date
5/17/2017
Contract Starting Date
5/17/2017
Contract Ending Date
6/30/2017
Contract Document Type
Contract
Amount
$4,575.00
Document Relationships
R 2017-195-E Planning - Hillsborough Plumbing Company Inc. to install RPZ at Brookhollow pump station
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:93098A2A-6990-46FE-8E24-D3170617D942 <br /> riLL4L.11111C11L ri <br /> HILLSBOROUGH PLUMBING CO., INC. <br /> 1020 Hwy. 57 N. <br /> Hillsborough,NC 27278 PROPOSAL <br /> N.C. MASTER PLUMBERS LIC. #8461 <br /> PHONE: (919)732-4506 <br /> FAX: (919)732-5804 <br /> May 4,2017 <br /> TO: Orange County Engineering ATTN: Allison Reinert <br /> JOB NAME/LOCATION: Sewer Pump Station—Alice Miller Ct. —Efland, NC <br /> We hereby submit estimates for <br /> Plumbing Scope: <br /> — Install (1)3/4" RPZ backflow preventer between existing water meter and yard hydrant. <br /> Backflow to be installed inside fenced enclosure. <br /> — Concrete pad to be poured around new backflow preventer and insulated enclosure to be installed <br /> over backflow and anchored to pad. <br /> — Heat trace cable to be installed on piping inside of insulated enclosure. <br /> — New RPZ to be tested to verify operation <br /> — New yard hydrant to be installed down stream of backflow <br /> — No permits included <br /> Plumbing Work Total: $2,350.00 <br /> Electrical Scope: <br /> — Wire for 120v circuit and receptacle for hot box heat trace. <br /> — Install will require a GFEP style circuit breaker <br /> — Conduit to be run underground approx. 8" deep from existing panel to hot box. <br /> — No permits included <br /> Electrical Work Total: $2,225.00 <br /> Notes: <br /> • Water shall be Copper <br /> • No rock excavation <br /> • All work shall be performed during normal working hours <br /> We Propose hereby to furnish material and labor-complete in accordance with the above specifications,for <br /> the sum of: $4,575.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.