Browse
Search
2017-194-E AMS - T.A. Loving Company to design-build services for Sportsplex field house
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-194-E AMS - T.A. Loving Company to design-build services for Sportsplex field house
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 9:13:46 AM
Creation date
5/31/2017 10:03:29 AM
Metadata
Fields
Template:
Contract
Date
5/2/2017
Contract Starting Date
10/31/2016
Contract Ending Date
3/1/2018
Contract Document Type
Contract
Agenda Item
9/6/16
Amount
$3,714,000.00
Document Relationships
2018-113-E AMS - TA Loving Sportsplex Field House Change Order 1
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
R 2017-194-E AMS - T.A. Loving Company to design-build services for Sportsplex field house
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:865881 C3-FBC1-4A19-8098-B2B092F29435 <br /> 36 <br /> preceding sentence, proceed with correction, paying the cost, including costs of uncovering <br /> such condemned Work, of such corrections from amounts due or to become due to the Design- <br /> Builder. <br /> (b) Condemned Work removed shall be the property of the Design-Builder and shall be removed <br /> from the Project by it within ten (10) days after notice to remove it, and if not then removed, <br /> thereafter may be disposed of by the Owner without compensation to the Design-Builder and <br /> the cost of such disposal shall be deducted from amounts due or to become due to the Design- <br /> Builder. Should the cost of correction of the Work and, if applicable, disposal of the condemned <br /> Work by the Owner exceed amounts due or to become due the Design-Builder, then the <br /> Design-Builder and the Design-Builder's sureties shall be liable for and shall pay to the Owner <br /> the amount of such excess. <br /> ARTICLE 17. CORRECTION OF WORK AFTER SUBSTANTIAL COMPLETION; <br /> WARRANTIES AND GUARANTIES <br /> 17.1 Neither the final certificate, Final Payment, occupation of the premises by the Owner, nor <br /> any provision of the Contract Documents, nor any other act or instrument of the Owner or the <br /> Owner's Authorized Representative shall relieve the Design-Builder from responsibility for <br /> negligence, defective material or workmanship, or failure to comply with the Contract <br /> Documents. <br /> 17.2 The Design-Builder shall, at the Design-Builder's sole cost and expense, make all <br /> necessary repairs, replacements, and corrections of any nature or description, interior or <br /> exterior, <br /> structural or non-structural, that shall become necessary by reason of defective workmanship or <br /> materials which appear within a period of one (1) year from the date of Substantial Completion; <br /> provided, however that notwithstanding the preceding, if any longer guarantee period is <br /> specified for any particular materials or workmanship under the Contract Documents, or under <br /> any subcontract, or in connection with any manufactured unit which is installed in the Project, or <br /> under the laws of the State of North Carolina, the longer guarantee period shall govern. <br /> 17.3 If, within any guarantee period, repairs or changes are required in connection with the <br /> Work, which are rendered necessary as the result of the use of materials, equipment, or <br /> workmanship which are inferior, defective, or not in accordance with the terms of the Contract <br /> Documents, the Design-Builder shall, promptly upon receipt of notice from the Owner's <br /> Authorized Representative and without expense to the Owner: <br /> a) Completely repair or replace the Work so that it conforms to the Contract Documents; <br /> b) Correct all defects therein; <br /> c) Make good all damage which, in the opinion of the Owner's Authorized Representative, is the <br /> result of the use of materials, equipment, or workmanship which are inferior, defective, or not in <br /> accordance with the terms of the Contract Documents; and <br /> d) Make good any Work or material, or any equipment or contents disturbed in fulfilling any such <br /> guarantee. <br /> Revised 2/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.