Browse
Search
2017-194-E AMS - T.A. Loving Company to design-build services for Sportsplex field house
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-194-E AMS - T.A. Loving Company to design-build services for Sportsplex field house
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2018 9:13:46 AM
Creation date
5/31/2017 10:03:29 AM
Metadata
Fields
Template:
Contract
Date
5/2/2017
Contract Starting Date
10/31/2016
Contract Ending Date
3/1/2018
Contract Document Type
Contract
Agenda Item
9/6/16
Amount
$3,714,000.00
Document Relationships
2018-113-E AMS - TA Loving Sportsplex Field House Change Order 1
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
R 2017-194-E AMS - T.A. Loving Company to design-build services for Sportsplex field house
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:865881 C3-FBC1-4A19-8098-B2B092F29435 <br /> 30 <br /> 12.12 The Owner shall have the right to perform Work, hire and employ labor and craftsmen, <br /> rent equipment, subcontract with other parties, or do anything that the Owner deems necessary <br /> or appropriate to remedy or cure any delay by the Design-Builder in the progress of the Work. <br /> Such action by the Owner shall not, in any way, affect, void, or limit any warranty, guaranty or <br /> other responsibility of the Design-Builder under the Contract Documents. Such action may be <br /> taken by the Owner only after three (3) days written notice to the Design-Builder. All costs <br /> incurred by the Owner in taking any such action shall be charged to the Design-Builder and <br /> deducted from any amounts remaining due under the Agreement. <br /> 12.13 The Design-Builder may be entitled to an extension of the Contract Time (but no increase <br /> in the Contract Sum) for delays arising from unforeseen causes beyond the control and without <br /> the fault or negligence of the Owner, the Design-Builder or the Design-Builder's Subcontractors <br /> as follows: <br /> a) Labor disputes and strikes that directly impact the critical path activities of the Contract <br /> Construction Schedule; <br /> b) Acts of God, tornado, fire, hurricane, blizzard, earthquake, typhoon, or flood that damage <br /> completed Work or stored materials. <br /> c) Acts of the public enemy; acts of the State, Federal, or local government in their sovereign <br /> capacities. <br /> d) Abnormal inclement weather as defined in Article 12.14. <br /> 12.14 On any day that the Design-Builder considers that the Project is delayed by adverse <br /> weather conditions, the Design-Builder shall identify in writing to the Owner's Authorized <br /> Representative the adverse weather conditions affecting each activity, the specific nature of the <br /> activity affected, the number of hours lost, and the number of and identity (by responsibility or <br /> trade) of workers affected and shall obtain from the Owner's Authorized Representative written <br /> recognition of the delay. The time for performance of this Contract includes an allowance for a <br /> number of calendar days which may not be suitable for construction Work by reason of adverse <br /> weather. The Contract Time will be extended only if the number of calendar days of adverse <br /> weather recognized by the Owner's Authorized Representative exceeds the number of <br /> inclement weather days set forth below, and the Design-Builder clearly and convincingly <br /> demonstrates how this adverse weather impacts activities on the critical path of the Contract <br /> Construction Schedule. Month Number of Inclement Weather Days: <br /> January 10 <br /> February 10 <br /> March 10 <br /> April 9 <br /> May 10 <br /> June 9 <br /> July 11 <br /> August 10 <br /> September 8 <br /> October 7 <br /> Revised 2/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.