Orange County NC Website
DocuSign Envelope ID:4D07A756-4236-4526-A1 D2-89F0777755FB <br /> 1114�1�i ��u1 I� l 1@iOJ, rrrr� D t °U°r �a 11 II 11 11 / °/11, 11 11 I <br /> 1111101 lip II III I11 11111 11111 i 1111111111 100111 <br /> • Generalized subsurface profile; <br /> • Soil test boring logs; and <br /> • Summary of laboratory test results. <br /> ECS will provide the report as a PDF by e-mail (and up to three hard copies, if requested). Please list <br /> those to whom the reports should be sent and provide their e-mail addresses, if appropriate, on the <br /> attached Proposal Acceptance Form. <br /> Phase I Environmental Site Assessment(ESA) <br /> The Phase I ESA will be prepared in general accordance with ASTM Standard E1527-13, Standard <br /> Practice for Phase I Environmental Site Assessments: Phase I Environmental Site Assessment Process. <br /> ECS reserves the right to adjust the quoted price for this Phase I ESA if supplemental investigation, <br /> additional lender requirements, or other services beyond the scope outlined in this proposal, are <br /> requested. <br /> In addition, the ASTM standard also requires a search for the existence of environmental liens and <br /> activity and use limitations (AULs)to be conducted in order to satisfy"All Appropriate Inquiry" in <br /> accordance with 40 CFR Part 312. If this information is not readily available, ECS can contract with a <br /> third party provider to conduct this search for an additional fee. It should be noted that failure to <br /> procure this information prior to acquisition of subject site (or contract for its attainment) may preclude <br /> your ability to qualify for certain liability protections. Please indicate on the attached authorization page <br /> if you would prefer ECS to obtain this information on your behalf. <br /> We have attached a User Questionnaire to assist the Orange County Government (User of the report) <br /> and the environmental professional (ECS) in gathering information from the User that may be material <br /> to identifying recognized environmental conditions with respect to the site. As the User of the report, <br /> please complete the attached User Questionnaire. In order to facilitate project completion, the User <br /> Questionnaire should be completed and returned to ECS at the same time this proposal is authorized. <br /> This Questionnaire will be included in the Phase I ESA Report and will assist in satisfying the "User's <br /> Responsibilities" portion of the ASTM Standard. <br /> In addition, we would appreciate receiving a current chain-of-ownership for the subject site back to at <br /> least 1940, if one is available from the Orange County Government. If this information is not readily <br /> available, ECS can conduct a 50-Year Chain of Title search for an additional fee. <br /> The proper performance of"due diligence" in respect to environmental site assessments requires both <br /> an on-site evaluation and a careful review of available applicable local, state, and federal public records. <br /> It would expedite matters if your office could provide ECS with a site plan and a point of contact for site <br /> access. <br /> ECS has included provisions for visual evaluation of non-scope items (i.e. asbestos, wetlands, mold, etc.) <br /> which may pose a business environmental risk(BER)to the subject site. ECS will not collect samples or <br /> perform testing of items. <br /> pllillyillillillmilli <br /> r1, iY1d /I /I/I rJ 1111111 �r � <br /> ffl <br /> �s,n I !, uinnnniuUiiiiUlli .. <br /> rir , <br />