Orange County NC Website
DocuSign Envelope ID:4D07A756-4236-4526-A1 D2-89F0777755FB <br /> �ummmmmmmmmmmmmmmmmmmmm� <br /> FEE SCHEDULE FOR SUBSURFACE EXPLORATION <br /> Southeast, LLP <br /> � � � ECS Proposal No. 06:20096 <br /> ENGINEERING - PROFESSIONAL, TECHNICAL AND SUPPORT SERVICES <br /> Personnel <br /> Administrative Support or Drafting $ 50.00/hour <br /> Engineering Assistant $ 55.00/hour <br /> Staff Professional $ 75.00/hour <br /> Project Professional $ 90.00/hour <br /> Senior Professional $ 110.00/hour <br /> Department Manager $ 125.00/hour <br /> Principal Professional $ 150.00/hour <br /> Senior Principal Professional $ 200.00/hour <br /> Field Exploration <br /> Mobilization/Demobilization of Truck or ATV Drill Rig $ 500.00/LS <br /> Drilling SPT Borings, 0 to 50 ft, N<50 bpf $ 12.50/LF <br /> Drilling SPT Borings, 51 to 75 ft, N<50 bpf $ 14.50/LF <br /> Drilling SPT Borings, 76 to 100 ft, N<50 bpf $ 18.50/LF <br /> Surcharge for Hard Drilling (N>50 bpf) $ 2.00/LF <br /> Surcharge for Wash or Mud Rotary Drilling $ 2.00/LF <br /> Additional SPT Samples $ 25.00/each <br /> Shelby Tube Sample Attempt $ 125.00/each <br /> Drilling Probe Holes Without Sampling $ 10.00/LF <br /> Bulk Sample Collection $ 50.00/each <br /> Temporary Hand-Slotted PVC Standpipe $ 3.00/LF <br /> Patching Asphalt or Concrete $ 25.00/each <br /> Drill Crew Hourly Rate (for Standby, Hand Clearing, Hauling Water, Difficult Moving, etc.) $ 250.00/hour <br /> Subcontract Bulldozer Clearing $ 1,500.00/day <br /> Private Utility Locate $ cost+15% <br /> Coring Equipment $ 250.00/day <br /> Mileage (portal-to-portal) $ 0.65/mile <br /> Laboratory Testing <br /> Natural Moisture Content(ASTM D2216) $ 10.00/each <br /> Percent Material Passing US No. 200 Sieve (ASTM D1140) $ 45.00/each <br /> Mechanical Sieve Analysis (ASTM D422) $ 75.00/each <br /> Hydrometer Analysis (ASTM D422) $ 150.00/each <br /> Atterberg Limits (ASTM D4318) $ 75.00/each <br /> Standard Proctor Compaction (ASTM D698) $ 130.00/each <br /> Modified Proctor Compaction (ASTM D1557) $ 140.00/each <br /> Direct Shear Strength (ASTM D3080) (3 normal stresses) $ 500.00/each <br /> California Bearing Ratio (ASTM D1883) $ 250.00/each <br /> Triaxial Shear Strength (ASTM D4767) (3 confining pressures) $ 900.00/each <br /> Permeability by Constant Head (ASTM D2434) $ 300.00/each <br /> One-Dimensional Consolidation (ASTM D2435) $ 500.00/each <br /> Notes: 1. Charges for engineering and technical personnel will be made for time spent in the field, <br /> in engineering analysis, in preparation of reports, and in portal-to-portal travel. <br /> 2. Overtime, at the rate of 1.5 x standard rate,will be charged for all personnel for <br /> work exceeding 40 hours per week, work over 8 hours per day, or during holidays, Saturdays, <br /> or Sundays. <br /> 3. If the normal drilling subcontractors are not available due to schedule or other reason,the <br /> drilling costs may vary from those above to meet the project schedule. <br /> 4. A surcharge of 50 percent will be applied to all time spent in depositions and testifying in a <br /> court of law <br /> 5. A surcharge of 25 percent will be applied to all time spent on a watercraft. <br />