Browse
Search
Agenda - 03-02-2006-7b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 03-02-2006
>
Agenda - 03-02-2006-7b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:49:08 AM
Creation date
8/29/2008 9:10:17 AM
Metadata
Fields
Template:
BOCC
Date
3/2/2006
Document Type
Agenda
Agenda Item
7b
Document Relationships
Minutes - 20060302
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recent Trends in OWASA Water and Sewer Demands <br />Water sales have remained below historical highs recorded in 2001 and 2002 even <br />though single family home construction has increased at a stable rate (Figures 5 and <br />6). Withdrawals from the University Lake/Cane Creek Reservoir/Stone Quarry <br />system during 2005 were 20 percent lower than projected in OWASA's 2001 <br />Contprebensive Water and Sewer Master Plan (Figure 7)- <br />1989-iB09 Av9rav9: <br />0.t90 m9tl Now <br />Oomantl pvr Yoar <br />Figure 6. Single;Family Residential Accounts <br /> Calendar Years 1992-2004 <br /> t4,o99 <br />m <br />c to 099 __ __. <br />~ 1002.2004 AVemge <br />- <br />v 000 --- <br />tT 366 New SPR -. ~ <br />_ <br />Q , Account, per Year <br />Y <br /> tt,999 <br />ai <br />r <br />E 19,999': - ~ .- ° - <br />~ <br /> ~. <br />~ ~ ." <br /> 9,999 <br /> 1992'. '1984 - 1996 1998 2000: 2002 ' 2004; <br /> Figure 7. <br />11 Projected and Actual Raw Water Demands <br />a :9m arolaaoa .~ <br />. . <br />" <br /> <br />n <br />w r~ <br />~ <br />~ <br />y <br />o <br />0 '; '~ <br /> ~ Y <br /> <br /> <br /> <br /> <br />7 <br />r <br />t; <br /> <br /> <br />_ .., <br /> <br />_ <br /> <br /> 2000 2001 2002 2003 2004 2005 <br />Projected Demantls: per OWASA's 2001 Master Plan <br />Recycletl Process Water: Water Ihat was formetly discardetl as paN of the normal <br />Irealmenl process is now recycletl IhmuOh the water treatmem plant <br />Raservoir Withdrawals: Total water pumpetl directly from reservoirs to the <br />Irealment plant <br />aaanwa <br />Pmcaaawamr '. <br />n .,.. <br />OW~tSA -Water mfd Sewer Capacity Implications of Increased Development Density <br />Page 14 of Zl <br />
The URL can be used to link to this page
Your browser does not support the video tag.