Browse
Search
Agenda - 03-02-2006-5n
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 03-02-2006
>
Agenda - 03-02-2006-5n
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:49:34 AM
Creation date
8/29/2008 9:10:08 AM
Metadata
Fields
Template:
BOCC
Date
3/2/2006
Document Type
Agenda
Agenda Item
5n
Document Relationships
Minutes - 20060302
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM :ERCD FRX N0. :9196443351 <br />FEB.SS.200~ 1~47PM O,RRN~E C7Y MGk' <br />dJl~i'~~ <br />Mar•. 02 2006 11:20RM Pl <br />ENO RIVER CONFLUENCE <br />C,ommg soo P aposed Schedule: Workday 9 AM-2 PMeazly April7) <br />Introdactinns and'fitatement of purpose <br />To bring rogetbet ail parties interested in the preser+-atioa and protecuo c safety, <br />Eno River, its Watershed, and its tributaries far environrnetttal, economic, p <br />and aesthetic reasons. 9ubsequcnt to this meeting, small working groups would be <br />e;,tiablished to discuss in depth the issues of iatcrest, with the intention that all participants <br />wi31 reassemble in the fail to consider their fwdiags and recommendations. <br />presentations: Sasie principles and E~sting Conditions (60 rtrinutes) <br />1. The aetrua of headwaters <br />2 The mechanics sad intatrclation of Eno and Upper Eno water bodies <br />3. 'T'ile health of the rvec <br />4, Land-use overview <br />Stakeholder Concerns (30 rninntes each) <br />1. Durham CiiylCoimty <br />2, Eno Rivcr?35sociation <br />3, fsao River State Park <br />4, Hillsborough <br />5, Lake Orange entities <br />6. Id.C. Division of Water Resources <br />~, 0¢ango-Alamance Water System <br />8.Orange County <br />LCTIYCH <br />lesser to be srticnlated and explored (90 minutes) <br />1. Capacity use, in-streat?t. flow, and ihL relationship l;etsvecn re~voirs <br />3. Potenfial ramifications ofDta'hem treating ldillsborough's water andlor wastewater <br />3, Gtotmdwazer and surface water interactions (large users, iarge~capaeity wells, etc..) <br />4, Long-term viability of Take Orange <br />5. G7earing of river obsavctions (emergency cad maintenance) <br />6. Contradictory views of canservatioa ordinance applicability <br />lnvrtees: Board of Health, Commission tar the Environment, Cooperative Extension, <br />Durham (City), Durhaar (Ceunry), Bconomre Develotuaent Coznmiasiaa, F..ao River <br />Association, Bno River Stara Park, Farmers, Hillsborough, Lake Orange Inc., Lake <br />Orange property owners, Mebane, NCDWR, Nt:DWQ Orange-Alamaace Water Systetn, <br />Orar~e and Ei'ilisborongb pT flTir1 boards, OWASA, Piedmont Naiaerals ~ ~~ ~'~"`' <br />WGtALGt f ,9~t~t9~C...' <br />~- <br />
The URL can be used to link to this page
Your browser does not support the video tag.