Browse
Search
2017-177-E AMS - Roof Control Services of NC, Inc. to repair shingle portion of roof, replace EPDM portion of roof
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-177-E AMS - Roof Control Services of NC, Inc. to repair shingle portion of roof, replace EPDM portion of roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 12:39:15 PM
Creation date
5/18/2017 9:47:32 AM
Metadata
Fields
Template:
Contract
Date
5/22/2017
Contract Starting Date
5/22/2017
Contract Ending Date
8/31/2017
Contract Document Type
Agreement - Construction
Amount
$8,670.00
Document Relationships
R 2017-177-E AMS - Roof Control Services of NC, Inc. to repair shingle portion of roof, replace EPDM portion of roof
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 7AE8A4FO-DD4C-48AF-9407-33 164957C9A2 <br /> ete COMMERCIAL ROOF <br /> INSTALLATION, <br /> RCSMAINTENANCE & REPAIR <br /> oar cordiro srvce , nc, <br /> PROPOSAL <br /> County of Orange Financial Services <br /> Attn: David Cannel! <br /> RE: Orange County Parks Operations Base <br /> Thank you for selecting Roof Control Services to provide our professional recommendations on the <br /> above referenced project. Based on our recent site visit, we offer the following scope of work for your <br /> consideration <br /> Scope of Work: EPDM Repairs (As listed on plans provided by 5" Wall) <br /> 1. Load materials on to roof and set up necessary safety equipment (if needed) <br /> 2. Strip in edge metal along existing gutter 23ft+1- <br /> 3. Strip in edge metal without gutter on all remaining sides 25ft i-/- <br /> 4. Repairs holes in membrane at chimney and filed 12ea <br /> 5. Repair membrane flashing at door threshold <br /> 6. Repair membrane flashing at shingle tie in 10ft+1- <br /> 7. Repair membrane flashing at siding 20ft+1- <br /> 8. Clean and repair gutter and downspouts 23ft <br /> 9. Caulk counter flashing at chimney <br /> 10. Upon completion of repair remove all job related materials and debris <br /> *miscellaneous repair to other items not necessarily listed herein:NTE $500.00 <br /> Total .$4,465.00 <br /> *Alternate(re-roof EPDM portion): New cover board, .60m1 TPO, and flashings$5,690.00 <br /> 104 Rand Park Drive • Garner, NC • 27529 <br /> 919-441-7668 Phone 321.251.6543 Fax • www.roofcontrol.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.